My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Stout Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
Responses
>
The Stout Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2021 8:57:38 AM
Creation date
9/28/2021 4:58:48 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Utility Undergrounding
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LF , $75.00 , NIA 1 $75.00 1 $159,450.00 <br />LF ` $75.00 1 NIA 1 $75.00 1 $813,975.00 <br />LF <br />Install only two M-2 inch PVC <br />NIA <br />$75.00 <br />schedule 40 conduit bundled in <br />LF <br />10 <br />one main trench with others for <br />2,126 <br />$5,250.00 <br />FPL Utility (FPL to furnish <br />$75.00 <br />NIA <br />material) <br />$10,125.00 <br />FA <br />Install only three (3)-2 inch PVC <br />NIA <br />$5,500.00 <br />schedule 40 conduit bundled in <br />Fro <br />11 <br />one main trench with others for <br />10,853 <br />$6,000.00 <br />FPL Utility (FPL to furnish <br />cast x <br />material) <br />Install only four (4)-2 inch PVC <br />quantity) <br />schedule 40 conduit bundled in <br />Install only 50" splice box for <br />17 FPL Utility (FPL to furnish 6 <br />12 <br />one main trench with others for <br />23 <br />$5,500.00 <br />FPL Utility (FPL to furnish <br />material <br />material) <br />Install only six (6)-2 Inch PVC <br />schedule 40 conduit bundled in <br />EA <br />13 <br />one main trench with others for <br />70 <br />$101,400.00 <br />FPI. Utility (FPL to furnish <br />18 <br />Utility (FPL to furnish material) <br />material) <br />Install only nine (9)-2 inch PVC <br />Install only concrete pad for <br />schedule 40 conduit bundled in <br />$2,500.00 <br />14 <br />one main trench with others for <br />135 <br />FPL Utility (FPL to furnish <br />material) <br />Install only feeder splice box for <br />(FPL to furnish material) <br />15 <br />FPL Utility (FPL to furnish <br />4 <br />material) <br />Install only concrete pad for vista <br />16 <br />switch cabinets for FPL Utility <br />2 <br />(FPL to furnish material) <br />LF , $75.00 , NIA 1 $75.00 1 $159,450.00 <br />LF ` $75.00 1 NIA 1 $75.00 1 $813,975.00 <br />LF <br />$75.00 <br />NIA <br />$75.00 <br />$1,725.00 <br />LF <br />$75.00 <br />NIA <br />$75.00 <br />$5,250.00 <br />LF <br />$75.00 <br />NIA <br />$75.00 <br />$10,125.00 <br />FA <br />$5,500.00 <br />NIA <br />$5,500.00 <br />$22,000.00 <br />Fro <br />$3,000.00 <br />NIA <br />$6,000.00 <br />$6,000.00 <br />Base <br />PAY ITEM <br />Total Unit <br />Price <br />Quantity <br />unit <br />Labor Unit <br />Cost <br />Material <br />unit Cost <br />Cost <br />(labor + <br />4 total unit <br />PER 01020 <br />material) <br />cast x <br />quantity) <br />Install only 50" splice box for <br />17 FPL Utility (FPL to furnish 6 <br />EA <br />$5,500.00 <br />N/A <br />$5,500.00 <br />$33,000.00 <br />material <br />Install only 30" handhole for FPL 26 <br />EA <br />$3,900.00 <br />N/A <br />$3,900.00 <br />$101,400.00 <br />18 <br />Utility (FPL to furnish material) <br />Install only concrete pad for <br />FA <br />$2,500.00 <br />NIA <br />$2,500.00 <br />$155,000.00 <br />19 transformers for FPL Utility 62 <br />(FPL to furnish material) <br />
The URL can be used to link to this page
Your browser does not support the video tag.