My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Stout Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
Responses
>
The Stout Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2021 8:57:38 AM
Creation date
9/28/2021 4:58:48 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Utility Undergrounding
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 <br />Install only 18"x24 service pull <br />boxes for FPL Utility (FPL to <br />238 <br />EA <br />$450.00 <br />N/A <br />$450.00 <br />$107,100.00 <br />furnish material) <br />Total Unit <br />Price <br />Quantity <br />Unit <br />Labor Unit <br />Material <br />Cost <br />Supply and install only two (2)-4 <br />_ <br />Cost <br />Unit Cost <br />(labor + <br />cost x <br />inch PVC schedule 40 conduit <br />material) <br />21 <br />bundled in one main trench <br />3,125 <br />LF <br />$12.00 <br />$13.68 <br />$25.68 <br />$80,250.00 <br />with others for Atlantic <br />(12 )-4 inch PVC schedule 40 <br />25 conduit bundled in one main 7 <br />Broadband <br />$66.00 <br />$82.04 <br />$148.04 <br />$1,036.28 <br />trench with others for Atlantic <br />Supply and install only four (4)- <br />Broadband <br />4 inch PVC schedule 40 conduit <br />Supply and install only two (2)-4 <br />22 <br />bundled in one main trench <br />4,797 <br />LF <br />$22.00 <br />$27.35 <br />$49.35 <br />$236,731.95 <br />$24.68 <br />with others for Atlantic <br />bundled in one main trench <br />Broadband <br />with others for AT&T <br />Supply and install only six (6)-4 <br />4)- <br />Supply and install only four (4)- <br />inch PVC schedule 40 conduit <br />27 <br />27 <br />4 inch PVC schedule 40 conduit <br />1,741 <br />LF <br />$22.00 <br />$27.35 <br />23 <br />bundled in one main trench <br />350 <br />LF <br />$33.00 <br />$41.02 <br />$74.02 <br />$25,907.00 <br />with others for Atlantic <br />with others for AT&T <br />Broadband <br />Supply and install only six (6)-4 <br />Supply and install only eight (8)- <br />28 <br />inch PVC schedule 40 conduit <br />213 <br />LF <br />$33.00 <br />$41.02 <br />$74.02 <br />4 inch PVC schedule 40 conduit <br />bundled in one main trench <br />24 <br />bundled in one main trench <br />10 <br />LF <br />$44.00 <br />$54.69 <br />$98.69 <br />$986.90 <br />with others for Atlantic <br />Broadband <br />Base <br />Total Unit <br />Price <br />Quantity <br />Unit <br />Labor Unit <br />Material <br />Cost <br />(total unit <br />_ <br />Cost <br />Unit Cost <br />(labor + <br />cost x <br />material) <br />quantity) <br />Supply and install only twelve <br />(12 )-4 inch PVC schedule 40 <br />25 conduit bundled in one main 7 <br />LF <br />$66.00 <br />$82.04 <br />$148.04 <br />$1,036.28 <br />trench with others for Atlantic <br />Broadband <br />Supply and install only two (2)-4 <br />26 <br />inch PVC schedule 40 conduit <br />8,921 <br />LF <br />$11.00 <br />$13.68 <br />$24.68 <br />$220,170.28 <br />bundled in one main trench <br />with others for AT&T <br />4)- <br />Supply and install only four (4)- <br />27 <br />27 <br />4 inch PVC schedule 40 conduit <br />1,741 <br />LF <br />$22.00 <br />$27.35 <br />$49.35 <br />$85,918.35 <br />bundled in one main trench <br />with others for AT&T <br />Supply and install only six (6)-4 <br />28 <br />inch PVC schedule 40 conduit <br />213 <br />LF <br />$33.00 <br />$41.02 <br />$74.02 <br />$15,766.26 <br />bundled in one main trench <br />with others for AT&T <br />
The URL can be used to link to this page
Your browser does not support the video tag.