Laserfiche WebLink
Supply and install only one (1)-2 <br />Base <br />29 <br />inch PVC schedule 40 conduit <br />61330 <br />LF <br />$4.00 <br />$2.60 <br />$6.60 <br />$41,778.00 <br />bundled in one main trench <br />Quantity <br />Unit <br />Labor Unit <br />Material <br />Cost <br />(total unit <br />- <br />with others for AT&T <br />Cost <br />Unit Cost <br />(labor + <br />cost x <br />Supply and install only two (2)-2 <br />material) <br />30 <br />inch PVC schedule 40 conduit <br />31208 <br />LF <br />$7.00 <br />$5.20 <br />$12.20 <br />$39,137.60 <br />bundled in one main trench <br />Supply and install only four (4y <br />35 <br />with others for AT&T <br />10,944 <br />LF <br />$13.00 <br />$10.39 <br />$23.39 <br />$255,980.16 <br />31 <br />Supply and install only 10"x 15" <br />84 <br />EA <br />$450.00 <br />$133.88 <br />$583.88 <br />$49,045.92 <br />handhole for AT&T <br />32 <br />Supply and install only 17"x 30" <br />48 <br />EA <br />$825.00 <br />$1,239.71 <br />$2,064.71 <br />$99,106.08 <br />35 <br />handhole for AT&T <br />358 <br />LF <br />$27.00 <br />$20.77 <br />$47.77 <br />$17,101.66 <br />33 <br />Supply and install only 30"x <br />48"x36" handhole for AT&T <br />16 <br />EA <br />$4,200.00 <br />$3,696.58 <br />$7,896.58 <br />$126,345.28 <br />Supply and install only two (2)- <br />34 <br />2 -inch PVC schedule 40 conduit <br />bundled in one main trench <br />293 <br />LF <br />$7.00 <br />$5.20 <br />$12.20 <br />$3,574.60 <br />37 <br />with others for City conduit <br />20 <br />Fro <br />$500.00 <br />$288.59 <br />$788.59 <br />$15,771.80 <br />Base <br />Total Unit <br />price <br />Quantity <br />Unit <br />Labor Unit <br />Material <br />Cost <br />(total unit <br />- <br />Cost <br />Unit Cost <br />(labor + <br />cost x <br />material) <br />quantity) <br />Supply and install only four (4y <br />35 <br />2 inch PVC schedule 40 conduit <br />10,944 <br />LF <br />$13.00 <br />$10.39 <br />$23.39 <br />$255,980.16 <br />bundled in one main trench <br />' <br />with others for City conduit <br />Supply and install only eight (8)- <br />35 <br />2 inch PVC schedule 40 conduit <br />358 <br />LF <br />$27.00 <br />$20.77 <br />$47.77 <br />$17,101.66 <br />bundled in one main trench <br />with others for City conduit <br />Supply and install only <br />37 <br />24"X13"X12" pull box for City <br />20 <br />Fro <br />$500.00 <br />$288.59 <br />$788.59 <br />$15,771.80 <br />conduit <br />38 <br />Flowable Fill <br />97,125 <br />CF <br />INCL. <br />INCL. <br />$6.75 <br />$655,593.75 <br />39 <br />Asphalt Mill & Resurface <br />34,583 <br />SY <br />INCL. <br />INCL. <br />$12.00 <br />$414,996.00 <br />40 <br />Construct Concrete Sidewalk <br />1 <br />ALLOWANCE <br />INCL. <br />INCL. <br />$375,000 <br />$375,000.00 <br />41 <br />Urban Walkway <br />1 <br />ALLOWANCE <br />INCL. <br />INCL. <br />$250,000 <br />$250,000-00 <br />42 <br />Concrete fill over FPL conduits <br />1 <br />ALLOWANCE <br />INCL. <br />INCL. <br />$15,000 <br />$15,000.00 <br />43 <br />CONTINGENCY <br />1 ALLOWANCE <br />NIA <br />NIA <br />$375,000 <br />1 $375,000.00 <br />