|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Jason Diehl, PE
<br />Senior Mechanical Engineer
<br />13. ROLE IN THIS CONTRACT
<br />Senior Mechanical Engineer
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />19
<br />b. WITH CURRENT FIRM
<br />11
<br />15. FIRM NAME AND LOCATION (City and State)
<br />OCI Associates, Inc., Maitland, Florida
<br />16. EDUCATION (Degree and Specialization)
<br />Bachelor of Science, Electrical Engineering, University of Central Florida
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />Professional Engineer Florida #57743
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.)
<br />Jason's experience includes the design, production, quality control, and coordination of engineering projects for 40+ government and
<br />municipal projects including The City Halls, Courthouses, Police Departments, Fire Stations and other public safety projects. He is currently
<br />working on the Village of Palm Springs Police Building Due Diligence Report and the City of Hollywood Police Headquarters, and will serve as
<br />the Senior Mechanical Engineer for your City's Space Needs Assessment & Feasibility Studies.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Village of Palm Springs Police Building Due Diligence Report
<br />Palm Springs, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Current
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
<br />Senior Mechanical Engineer | Due Diligence Report of Village of Palm Springs Police Department's will include a site visit to evaluate the
<br />condition of existing mechanical systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/
<br />longevity as well as recommendation for remedial repair or replacement.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Florida Highway Patrol Orlando International Drive Facility
<br />Orlando, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
<br />Project Manager + Senior Mechanical Engineer | Due Diligence Report and Assessment of the existing building mechanical systems that
<br />support an existing two-story building located at 11059 International Drive, Orlando. Our report will only pertain to existing systems
<br />related to building for a possible purchase by the Florida Highway Patrol.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Florida Highway Patrol Troop D Station Facility Assessment
<br />Orlando, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
<br />Project Manager + Senior Mechanical Engineer | With Department of management Services (DMS). Cocoa HQ Building Roof Replacement
<br />10,400 SF Existing building needs a lightening protection evaluation of existing mechanical systems, a report of findings such as general
<br />condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Department of Military Affairs West Palm Beach District Court of Appeal Renovation
<br />Palm Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Current
<br />CONSTRUCTION (If applicable)
<br />Current
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
<br />Senior Mechanical Engineer | Due Diligence Report and Assessment includes evaluation of existing electrical systems, a report of findings
<br />such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or
<br />replacement and a probable cost estimate to turn into a Readiness Center for the US National Guard.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of Hollywood Police Headquarters
<br />Hollywood, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Current
<br />CONSTRUCTION (If applicable)
<br />Est. 2024
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
<br />Senior Mechanical Engineer | 4-Story facility includes all functions including training and gun range, property and evidence, quartermaster,
<br />patrol, holding cells, detective units, recruitment, administration and public information; includes a 110,000 SF parking structure to
<br />support 350 vehicles.
|