Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Jason Diehl, PE <br />Senior Mechanical Engineer <br />13. ROLE IN THIS CONTRACT <br />Senior Mechanical Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />19 <br />b. WITH CURRENT FIRM <br />11 <br />15. FIRM NAME AND LOCATION (City and State) <br />OCI Associates, Inc., Maitland, Florida <br />16. EDUCATION (Degree and Specialization) <br />Bachelor of Science, Electrical Engineering, University of Central Florida <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Professional Engineer Florida #57743 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.) <br />Jason's experience includes the design, production, quality control, and coordination of engineering projects for 40+ government and <br />municipal projects including The City Halls, Courthouses, Police Departments, Fire Stations and other public safety projects. He is currently <br />working on the Village of Palm Springs Police Building Due Diligence Report and the City of Hollywood Police Headquarters, and will serve as <br />the Senior Mechanical Engineer for your City's Space Needs Assessment & Feasibility Studies. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Village of Palm Springs Police Building Due Diligence Report <br />Palm Springs, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Current <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm <br />Senior Mechanical Engineer | Due Diligence Report of Village of Palm Springs Police Department's will include a site visit to evaluate the <br />condition of existing mechanical systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/ <br />longevity as well as recommendation for remedial repair or replacement. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Florida Highway Patrol Orlando International Drive Facility <br />Orlando, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm <br />Project Manager + Senior Mechanical Engineer | Due Diligence Report and Assessment of the existing building mechanical systems that <br />support an existing two-story building located at 11059 International Drive, Orlando. Our report will only pertain to existing systems <br />related to building for a possible purchase by the Florida Highway Patrol. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Florida Highway Patrol Troop D Station Facility Assessment <br />Orlando, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm <br />Project Manager + Senior Mechanical Engineer | With Department of management Services (DMS). Cocoa HQ Building Roof Replacement <br />10,400 SF Existing building needs a lightening protection evaluation of existing mechanical systems, a report of findings such as general <br />condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Department of Military Affairs West Palm Beach District Court of Appeal Renovation <br />Palm Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Current <br />CONSTRUCTION (If applicable) <br />Current <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm <br />Senior Mechanical Engineer | Due Diligence Report and Assessment includes evaluation of existing electrical systems, a report of findings <br />such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or <br />replacement and a probable cost estimate to turn into a Readiness Center for the US National Guard. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />City of Hollywood Police Headquarters <br />Hollywood, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Current <br />CONSTRUCTION (If applicable) <br />Est. 2024 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm <br />Senior Mechanical Engineer | 4-Story facility includes all functions including training and gun range, property and evidence, quartermaster, <br />patrol, holding cells, detective units, recruitment, administration and public information; includes a 110,000 SF parking structure to <br />support 350 vehicles.