Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Kaz Kazeminia, NICET <br />Principal + Director of Plumbing & Fire Protection <br />13. ROLE IN THIS CONTRACT <br />Director of Plumbing & Fire Protection <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />24 <br />b. WITH CURRENT FIRM <br />24 <br />15. FIRM NAME AND LOCATION (City and State) <br />OCI Associates, Inc., Maitland, Florida <br />16. EDUCATION (Degree and Specialization) <br />American University, Washington DC <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />NICET <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.) <br />Kaz has over 24 years of experience in the design of Plumbing and Automatic Fire Sprinkler systems for government facilties. He has been <br />involved in over 150 designs for government projects including The City Halls, Police Departments, County Libraries, and various Public Safety <br />and Municipal facilities. Kaz is currently working on the St. Lucie County Library Port Branch Assessment and the Village of Palm Springs Police <br />Due Diligence Report and will serve as the Director of Plumbing & Fire Protection for your City's Space Needs Assessment & Feasibility Studies. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Village of Palm Springs Police Building Due Diligence Report <br />Palm Springs, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Current <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm <br />Director of Plumbing & Fire Protection | Due Diligence Report of Village of Palm Springs Police Department's will include a site visit to <br />evaluate the condition of existing plumbing & fire protection systems, a report of findings such as general condition, MEP engineer’s <br />opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />San Francisco International Airport GBAS Feasibility Study <br />San Francisco, California <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm <br />Director of Plumbing & Fire Protection | GBAS Feasibility Study to evaluate the condition of existing plumbing & fire protection systems, <br />a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for <br />remedial repair or replacement and a probable cost estimate. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />United States GSA Chambers Courthouse Study <br />San Francisco, California <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm <br />Director of Plumbing & Fire Protection | Courthouse Feasibility Study includes a site visit to evaluate the condition of existing plumbing & <br />fire protection systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well <br />as recommendation for remedial repair or replacement and a probable cost estimate <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />San Francisco International Airport Superbay Study <br />San Francisco, California <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm <br />Director of Plumbing & Fire Protection | Superbay Hangar Door Brake Feasibility Study to evaluate the condition of existing plumbing & <br />fire protection systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well <br />as recommendation for remedial repair or replacement and a probable cost estimate. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Department of Military Affairs West Palm Beach District Court of Appeal Renovation <br />Palm Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Current <br />CONSTRUCTION (If applicable) <br />Current <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm <br />Director of Plumbing & Fire Protection | Due Diligence Report and Assessment includes evaluation of existing electrical systems, a report <br />of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial <br />repair or replacement and a probable cost estimate to turn into a Readiness Center for the US National Guard.