My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CPZ Architects Submittal RFQ 21-10-01 11-29-2021
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(21-10-01) Space Needs Assessment Feasibility Study (CCNA)
>
RESPONSES
>
CPZ Architects Submittal RFQ 21-10-01 11-29-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2021 12:15:22 PM
Creation date
12/1/2021 12:14:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Art Munns, CxA <br />Director of Building Commissioning <br />13. ROLE IN THIS CONTRACT <br />Director of Building Commissioning <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />36 <br />b. WITH CURRENT FIRM <br />9 <br />15. FIRM NAME AND LOCATION (City and State) <br />OCI Associates, Inc., Maitland, Florida <br />16. EDUCATION (Degree and Specialization) <br />Mechanical Design and Assembly, Massanutten Technical Center, Harrisonburg, VA <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />CxA #514-1170 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.) <br />Art has over 35 years of experience in mechanical engineering production, project management, energy modeling, and building commissioning <br />(LEED fundamental & LEED enhanced). He has recently completed assessments and studies for government projects including Okeechobee <br />Sheriff's Office Assessment and Okeechobee Co Health Department HVAC Feasibility Report and will serve as the Director of Building <br />Commissioning for your City's Space Needs Assessment & Feasibility Studies. <br />19. RELEVANT PROJECTS <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Okeechobee Sheriff's Office Jail Assessment & Report <br />Okeechobee, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2020 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm <br />Project Engineer - Mechanical | Site visit and assessment of the existing systems at the existing 112,000 SF jail in preparation of a <br />renovation and expansion to the facility provide a report of our findings such as general condition, MEP engineer’s opinion of overall <br />serviceability/longevity as well as recommendation for remedial repair or replacement of the existing systems. <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Osceola County West Command Center Feasibility Study <br />Kissimmee, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm <br />Project Manager + Director of Building Commissioning | An assessment of the existing MEP/FP systems to convert an old abandoned <br />Publix into a new $5.5 Million command center for Osceola County. Our scope required a site visit to evaluate the condition of the <br />existing systems to convert the 26,000 SF space into a new Command Center to support the West side of the county. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Okeechobee Co Health Department HVAC Feasibility Report <br />Okeechobee, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2020 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm <br />Project Engineer - Mechanical | Site visit and reports of the existing systems to include recommendations for remedial repairs including <br />but not limited to replacement of units and conditioning mechanical spaces in attics or replace all units with an air-cooled chiller with <br />AHU’s and VAV system. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />The City of Jupiter The City Hall Cx <br />Jupiter, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Current <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm <br />Project Manager + Director of Building Commissioning | OCI’s Cx team will provide “Fundamental” Building Commissioning services <br />in accordance with guidelines as outlined by AABC Commissioning Group. OCI is designing the MEP/FP/ITS/AV/Cx engineering to the <br />41,500-square-feet The City Hall. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />City of Hollywood Police Headquarters Cx <br />Hollywood, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Current <br />CONSTRUCTION (If applicable) <br />Est. 2024 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm <br />Project Manager + Director of Building Commissioning | 4-Story facility includes all functions including training and gun range, property <br />and evidence, quartermaster, patrol, holding cells, detective units, recruitment, administration and public information; includes a <br />110,000 SF parking structure to support 350 vehicles.
The URL can be used to link to this page
Your browser does not support the video tag.