Laserfiche WebLink
AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) PAGE 1 <br /> <br /> <br />j E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME Dan Jeffreys 13. ROLE IN THIS CONTRACT <br />Senior Cost Estimator <br />14. YEARS EXPERIENCE <br />a. TOTAL 35 b. WITH CURRENT FIRM 16 <br />15. FIRM NAME AND LOCATION (City and State) CMS-Construction Management Services, Inc. – Deerfield Beach, FL 33441 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />University of North Florida – Construction Management <br />University of Florida – Architecture Program <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> N/A <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />N/A <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />City of Sunrise – Sunrise Senior Center Renovation and Addition <br />Sunrise, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Description: Renovation and Addition to Center which includes parking lot expansion, a new exercise room, a new craft <br />room, a new media room, renovated kitchen area with new equipment, and a garden area that has a room with glass- <br />paneled walls, featuring living walls, or vertical gardens, waist-high plants, and a computer room and exercise room. <br />Size: Building Addition Size = 2,200 SF <br />Cost: $2,584,490.00 <br />Scope of Work: Schematic Design / Design Development / Construction Documents Cost Estimating <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Sunrise Public Safety Building - Community Meeting Room Addition <br />& Site Improvements <br />Sunrise, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Description: New Meeting Room addition and site improvements (new pump room, painting canopy, refurbish fountain) <br />Size: Meeting Room = 865 SF; Site Improvements = 5,000 SF <br /> Cost: $863,594.00 <br />Scope of Work: Design Development / Construction Documents Cost Estimating <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />City of Miami Beach – Police Headquarters – Visitors Parking Garage <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Description: New Addition to existing Parking Garage <br />Size: Project Site Size = 46,415.00 SF (New Added Area) <br />Cost: $11,320,752.00 <br />Scope of Work: Order of Magnitudes Cost Estimating <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) Miami-Dade County Internal Services Department ‒ Mental Health <br />Facility Renovation <br />Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Description: Buiildout/Rehabilitation/Renovation of existing 7-story facility for defendants too mentally unstable to stand <br /> trial on criminal charges <br />Size: Project Site Size = 214,382 SF; Building = 181,324 SF <br />Cost: $39,184,118.00 <br />Scope of Work: Schematic Design / Design Development / Construction Document Cost Estimating <br /> <br /> Continued…