Laserfiche WebLink
AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) PAGE 2 <br /> <br /> <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Apotex Florida Expansion – Phases A, B and C <br />Miramar, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Description: Interior buildout; addition of an entire floor to the existing building <br />Size: Project Site Size = 165,400 SF <br />Cost: $24,999,989.00 <br />Scope of Work: Construction Documents Cost Estimating <br />f. <br />(1) TITLE AND LOCATION (City and State) <br />City of Lake Worth – Beach Complex Casino Building <br />Lake Worth, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Description: Renovation of existing oceanfront municipal park including casino building, new service area, new <br />swimming pool, new drop-off area, new stage area, new maintenance facility, parking lots/parking garage, new stair <br />elevator tower <br />Size: 13 Acres <br />Cost: Five different schemes ranging from $18,161,285.00 to $59,015,031.00 <br />Specific Role: Order of Magnitude Cost Estimating <br /> <br />g. <br /> <br />(1) TITLE AND LOCATION (City and State) <br />City of Coral Springs – Westside Maintenance Facility <br />Coral Springs, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2020 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Description: Addition of a second story to the existing one-story, 50,026 SF Vehicle Maintenance Facility with Central <br />Storages/Offices and Parking Lot; includes sitework, utilities, lighting, and landscaping <br />Size: Phase 1 – Central Stores/Offices = 17,741 SF; Phase 2 – Maintenance Facility Addition = 26,000 SF; Parking Lot = <br />27,345 SF) <br />Cost: $28,471,800.00 <br />Scope of Work: Order of Magnitude / Construction Documents Cost Estimating <br />h. <br />(1) TITLE AND LOCATION (City and State) Broward County – West Regional Courthouse (Phase II) – Clerk of <br />Courts, Civil & Marriage <br />Plantation, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2020 CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Description: Interior renovation (buildout) of existing space which includes demolition and installation of new floors, <br />ceilings, ballistic-resistant windows, painting, replacing of furniture, doors, carpeting, fire extinguishers, HVAC, and <br />adjusting Mechanical / Electrical / Plumbing to reflect the new layout of space <br />Size: 11,600 SF <br />Cost: $1,686,039.00 <br />Specific Role: Construction Cost Estimating <br />I. <br />(1) TITLE AND LOCATION (City and State) <br />Miami-Dade College – Eduardo J. Padrón Campus Plaza (Building <br />6000, Remodeling of Vacant Floors 11, 12, 14 & 15) for Classrooms <br />and Administrative Offices (Phases II & III) <br />Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2020 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Description: Buildout/Remodel of Floors 11, 12, 14 & 15 for future classrooms with administrative offices on 11th floor <br />Size: Each floor = 11,260 SF <br />Cost: $9,271,693.00 (Floor #11 = $2,251,397.00; Floor #12 = $2,214,058.00; Floor #14 = $2,273,960; Floor #15 = <br />$2,532,279.00) <br />Scope of Work: Conceptual Schematic / Design Development / Construction Documents Cost Estimating <br />