Laserfiche WebLink
20. EXAMPLE PROJECT KEY <br />NUMBER <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> 2018 <br />CONSTRUCTION (if Applicable) <br />2019 <br />23. PROJECT OWNER’S INFORMATION <br />a.PROJECT OWNER <br />City of Delray Beach <br />b.POINT OF CONTACT NAME <br />Dan Tintner <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />954-972-3959 ext. 150 <br />24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUQUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />Delray Beach Police Department Assessment Study <br />Delray Beach, Florida <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />5 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> 2018 <br />CONSTRUCTION (if Applicable) <br />2019 <br />23. PROJECT OWNER’S INFORMATION <br />a.PROJECT OWNER <br />City of Delray Beach <br />b.POINT OF CONTACT NAME <br />Dan Tintner <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />954-972-3959 ext. 150 <br />24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUQUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />Delray Beach Police Department Assessment Study <br />Delray Beach, Florida <br />The City of Delray Beach Police Department hired CPZ to complete a needs and assessment study of their existing Police Department Facilities to determine if the existing building could be renovated or based on the results of the assessment report build a new Police Facility. CPZ Architects has completed a needs basement of the Delray Beach Police Station outlining their current needs and providing an estimate of the future space needs for the next 10 years. A conceptual master plan was developed for two possible solutions to their space needs along with budgetary estimates. Option 1 included using the existing facility and expanding around the facility along with construction of parking garage. The second option was to construct a completely new multi-story facility on the back part of the site, while maintaining operation in the existing facility. Upon competition of the new facility, demolish the existing facility and construct the new parking garage. CPZ Architects has now been retained to provide a needs assessment for the City Hall and Community Center Site. <br />a. <br />(1)FIRM NAME <br />CPC South Florida. <br />(2)FIRM LOCATION (City and State) <br />Deerfield Beach, Florida <br />(3)ROLE <br />Engineer <br />b. <br />(1)FIRM NAME <br />CPZ Architects, Inc. <br />(2)FIRM LOCATION (City and State) <br />Plantation, Florida <br />(3)ROLE <br />Architect <br />c. <br />(1)FIRM NAME <br />MUEngineers, Inc. <br />(2)FIRM LOCATION (City and State) <br />Oakland Park, Florida <br />(3)ROLE <br />Structural Engineer