My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CPZ Architects Submittal RFQ 21-10-01 11-29-2021
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(21-10-01) Space Needs Assessment Feasibility Study (CCNA)
>
RESPONSES
>
CPZ Architects Submittal RFQ 21-10-01 11-29-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2021 12:15:22 PM
Creation date
12/1/2021 12:14:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20. EXAMPLE PROJECT KEY <br />NUMBER <br />4 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> 2018 <br />CONSTRUCTION (if Applicable) <br />2019 <br />23. PROJECT OWNER’S INFORMATION <br />a.PROJECT OWNER <br />City of Delray Beach <br />b.POINT OF CONTACT NAME <br />Dan Tintner <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />954-972-3959 ext. 150 <br />24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1)FIRM NAME <br />CPC South Florida. <br />(2)FIRM LOCATION (City and State) <br />Deerfield Beach, Florida <br />(3)ROLE <br />Engineer <br />b. <br />(1)FIRM NAME <br />CPZ Architects, Inc. <br />(2)FIRM LOCATION (City and State) <br />Plantation, Florida <br />(3)ROLE <br />Architect <br />c. <br />(1)FIRM NAME <br />MUEngineers, Inc. <br />(2)FIRM LOCATION (City and State) <br />Oakland Park, Florida <br />(3)ROLE <br />Structural Engineer <br />The Delray Beach City Hall and Community Center Needs Assessment is a study project, in conjunction with Carnahan, <br />Proctor and Cross. We are the space study entity of the project where CPC will provide the Survey of the existing <br />facility. We are directed to define the current use of the facility then determine the future needs of the Complex as it <br />stands today or the potential of consolidating the current users and additional users into a City Center concept. New 365 <br />Car Garage. <br />F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACTQU(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />Delray Beach City Hall Assessment Study <br />Delray Beach, Florida
The URL can be used to link to this page
Your browser does not support the video tag.