My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFQ 21-10-01_Architects Design Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(21-10-01) Space Needs Assessment Feasibility Study (CCNA)
>
RESPONSES
>
RFQ 21-10-01_Architects Design Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2021 12:34:44 PM
Creation date
12/1/2021 12:33:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> 20. EXAMPLE PROJECT KEY NUMBER <br />7 <br /> 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />SARASOTA POLICE HEADQUARTERS <br />SARASOTA, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE) <br />2008 2011 <br />23. PROJECT OWNER’S INFORMATION <br />A. PROJECT OWNER B. POINT OF CONTACT NAME C. POINT OF CONTACT PHONE NUMBER <br />CITY OF SARASOTA BARB ROSS, ASSISTANT TO THE CHIEF (941) 954 - 7012 <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (INCLUDE SCOPE, SIZE AND COST) <br />ADG was selected to provide a detailed spatial needs assessment, site analysis of <br />multiple sites, master plan, full-design documents, construction administration, <br />and voter referendum assistance for the new six-story Sarasota Police <br />Headquarters, which houses the department’s 250 employees. The new 196,000- <br />SF facility design included spaces for professional standards, support services, <br />internal affairs, criminal investigations, property and evidence, and records. <br />Additionally, the building included 21,790-SF for crime scene investigations, 9,275- <br />SF for forensics and evidence storage, and 2,860-SF for vehicle processing. Several <br />specialized areas are designed into the secured garage including a SWAT-tactical <br />ready room, SWAT vehicle storage, vehicle evidence processing bays, and the <br />central energy plant, which includes the HVAC chillers and emergency generator <br />/ fuel tank. The entire facility was designed to withstand Category-5 hurricane <br />force winds. With the critical infrastructure redundancies that are in place, this <br />headquarters is built to maintain operations during or after a significant event. <br />This LEED-certified facility fronts a beautiful 40-acre passive recreation park, <br />creating a large-scale backdrop to the park. <br />The multi-story, 200-vehicle, secured parking garage is an integral component <br />to making the headquarters a reality. The project was completed on time, under <br />budget, and received the AIA Orlando Chapter Design Excellence Award. <br />25. FIRMS FOR SECTION C INVOLVED WITH THIS PROJECT <br />A (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />ARCHITECTS DESIGN GROUP WINTER PARK, FL ARCHITECT OF RECORD <br />B (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />TLC ENGINEERING SOLUTIONS ORLANDO, FL SECURITY & TECHNOLOGY <br />C (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />DEREK WASSINK, PE (PREVIOUS FIRM)FORT LAUDERDALE, FL STRUCTURAL ENGINEERING <br />41
The URL can be used to link to this page
Your browser does not support the video tag.