Laserfiche WebLink
CGL Companies | 13 <br />Phase 4 Developing Conceptual Plan <br />Developing an overall plan for the initial and possible future development of the site <br />will provide a “roadmap” and clearly identify the City’s vision for a thriving municipal <br />complex. The final document will become the City’s road map to future growth and <br />development - a living document that assists leadership in making decisions related to <br />capital improvement needs and projects. <br />Task 4.1 Strategic Plan. Recommendations will be made regarding the priorities <br />for initiating short- and long-term space strategy improvements in sufficient detail <br />to enable the City to act on internal space assignments and re-locations of existing <br />buildings. These recommendations will be coordinated and presented along with <br />location and site recommendations and alternatives to assist the City to meet near term <br />needs in a manner consistent with the long-term growth objectives and facility plans <br />resulting from the study. <br />Task 4.2 Cost Estimates and Implementation Schedule. The strategic plan will be <br />further refined with educated cost estimates coupled with an implementation schedule. <br />The cost estimates will include: <br />• Use square footage needs with current and regional cost-per-square foot figures to <br />determine a construction cost index <br />• 20% – 35% additive to address owner’s/ indirect costs to address all probable fees <br />• FF&E, testing, permits and a design and construction contingency <br />• Funding schedule <br />• Facilities Condition Index to provide current repair/remodel cost <br />• Maintenance and life cycle cost review <br />The implementation schedule will identify the sequence of recommended key <br />milestones. <br />Task 4.3: Final Report and Presentation. The team will compile all reports into a final <br />electronic plan to document the vision and needs assessment, options available to the <br />City, and the recommended long-term strategy to accommodate the operational goals <br />and projected needs of the Police Department. Upon report review and finalization, the <br />final plan will be presented to City stakeholders.