Laserfiche WebLink
CGL Companies | 29 <br />MIRAMAR POLICE <br />HEADQUARTERS <br />DESIGN BUILD <br />LOCATION <br />Miramar, Florida <br />SIZE <br />55,000 SF <br />COMPLETION DATEJune 2016 <br />PROJECT COST <br />$23 million <br />PROJECT DESCRIPTION <br />CGL provided design review and <br />consulting services for the City of <br />Miramar Police Headquarters. Located <br />in the Town center area of Miramar the <br />facility is housed in a three story building <br />that defines one edge of the civic plaza. <br />The building includes separate entrances <br />for the public, staff and internal affairs <br />as well as a dedicated secure vehicle <br />sallyport adjacent to the booking area and <br />holding cells. A media room is located <br />on the ground floor adjacent to the main <br />public entrance. The facility includes <br />spaces for the criminal investigations <br />and support services bureaus, the patrol <br />division, communications, fitness and <br />locker room areas for men and women as <br />well as space for the office of the chief <br />and command staff. <br />Due to the buildings location in a dense <br />new-urbanist development the facility <br />includes extensive security measures. <br />These include ballistic glazing throughout, <br />a structural system designed to prevent <br />progressive collapse from explosive <br />blasts, ballistic glazing at the main <br />lobby and correctional grade materials <br />and hardware for the holding cells. The <br />building is designed to withstand category <br />5 hurricane force winds and is provided <br />with full backup emergency generators.