My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CGL_City of Sunny Isles Beach_Needs Assessment_Site Feasibility_Electronic Copy
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(21-10-01) Space Needs Assessment Feasibility Study (CCNA)
>
RESPONSES
>
CGL_City of Sunny Isles Beach_Needs Assessment_Site Feasibility_Electronic Copy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2021 1:44:15 PM
Creation date
12/1/2021 1:43:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CGL Companies | 29 <br />MIRAMAR POLICE <br />HEADQUARTERS <br />DESIGN BUILD <br />LOCATION <br />Miramar, Florida <br />SIZE <br />55,000 SF <br />COMPLETION DATEJune 2016 <br />PROJECT COST <br />$23 million <br />PROJECT DESCRIPTION <br />CGL provided design review and <br />consulting services for the City of <br />Miramar Police Headquarters. Located <br />in the Town center area of Miramar the <br />facility is housed in a three story building <br />that defines one edge of the civic plaza. <br />The building includes separate entrances <br />for the public, staff and internal affairs <br />as well as a dedicated secure vehicle <br />sallyport adjacent to the booking area and <br />holding cells. A media room is located <br />on the ground floor adjacent to the main <br />public entrance. The facility includes <br />spaces for the criminal investigations <br />and support services bureaus, the patrol <br />division, communications, fitness and <br />locker room areas for men and women as <br />well as space for the office of the chief <br />and command staff. <br />Due to the buildings location in a dense <br />new-urbanist development the facility <br />includes extensive security measures. <br />These include ballistic glazing throughout, <br />a structural system designed to prevent <br />progressive collapse from explosive <br />blasts, ballistic glazing at the main <br />lobby and correctional grade materials <br />and hardware for the holding cells. The <br />building is designed to withstand category <br />5 hurricane force winds and is provided <br />with full backup emergency generators.
The URL can be used to link to this page
Your browser does not support the video tag.