|
24
<br />SECTION E Qualification Information and Assigned Personnel
<br />RFQ # 21-11-01 PROFESSIONAL PLANNING AND ZONING CONSULTING SERVICES, CIVIL AND TRAFFIC ENGIEERING
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Joseph M. Corradino, AICP Project Manager a. TOTAL b. WITH CURRENT FIRM
<br />27 24
<br />15. FIRM NAME AND LOCATION (City and State)
<br />TThhee CCoorrrraaddiinnoo GGrroouupp,, IInncc.. –– MMiiaammii, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />M.A. (Community Planning) University of Cincinnati, 1992 B.A. Villanova University (Geography), 1990 American Institute of Certified Planner (AICP), Florida No. 012032
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />American Planning Association (APA) Award for Outstanding Mobility Project: Palmetto Bay Transportation Master Plan
<br />APA Award for Excellence: Miami Beach Municipal Mobility Study | Clearwater “One City, One Future” Strategic Plan
<br />APA Award for Outstanding Achievement: Alton Road Traffic Calming |Transportation Concurrency Management Areas
<br />Florida Redevelopment Association Award: Hialeah Transportation Concurrency Management Areas
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />Cutler Bay - Transportation Master Plan and Transportation, Planning & Civil
<br />Engineering Services, Town of Cutler Bay, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />22000077--OOnnggooiinngg NN//AA
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm
<br />Principal-in-Charge. Corradino serves as the Town’s General Consultant assisting with transportation, planning and civil engineering
<br />projects. As part of this GES contract Corradino produced the Transportation Master Plan, completed traffic calming analyses, wrote the
<br />Town’s Land Development Regulations.
<br />b.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />Miami-Dade County TPO SMART Plan/North Corridor
<br />Miami-Dade County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />22001199 NN//AA
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm
<br />Project Manager. On April 21, 2016, the Miami-Dade TPO Governing Board passed the Strategic Miami Area Rapid Transit (SMART) Plan
<br />recognizing the community’s long-standing desire to advance a program of rapid transit and supporting projects to address the mobility
<br />needs throughout Miami-Dade County. The six SMART Corridors are: North Corridor (NW 27th Avenue); South Dade Transit Way; Tri-Rail
<br />Coastal Link (Northeast/FEC Corridor); East-West Corridor (SR-836); Kendall Corridor; and, Beach Corridor.
<br />c.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />Homestead General Planning Services
<br />City of Homestead, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />OOnnggooiinngg N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm
<br />Principal-in-Charge. The Corradino Group, Inc. (Corradino) was tasked with completing Comprehensive Plan Future Land Use Plan Map
<br />amendments, the rezoning of City-owned properties in Downtown Homestead and amending the zoning code to allow for public and
<br />retail/entertainment facilities.
<br />
<br />d.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />Palmetto Bay Professional Services – Traffic Engineering, Urban Planning and
<br />General A/E Services
<br />Village of Palmetto Bay, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />22000066 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm
<br />Principal-in-Charge. Palmetto Bay is a city along the South Corridor. Its citizens are highly sensitive to growth, particularly to the south,
<br />because that traffic currently drives through their community deteriorating the quality of life. They have re-land used and rezoned their
<br />downtown to provide for transit-oriented densities. Corradino provides the City with the following services: General Urban Planning to
<br />include, but not limited to comprehensive planning, land development regulation, charrettes; neighborhood plans, and code enforcement
<br />regulations. General Traffic Engineering Services, to include, but not limited to traffic counts and reports.
<br />e.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />Transportation Master Plan, General Planning and Engineering Services
<br />City of Doral, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2009-2017 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm
<br />Principal-in-Charge. Corradino has developed the City's first transportation master plan, reviewed developments moving through the
<br />public hearing process, reviewed applicants traffic impact analysis, planned, implemented and managed one of the most successful
<br />municipal circulator systems, and provided in-house staff assistance in day-to-day planning and engineering functions.
|