|
25
<br />SECTION E Qualification Information and Assigned Personnel
<br />RFQ # 21-11-01 PROFESSIONAL PLANNING AND ZONING CONSULTING SERVICES, CIVIL AND TRAFFIC ENGIEERING
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Edward Ng, MPP, MPL, AICP QA/QC a. TOTAL b. WITH CURRENT FIRM
<br />11 8
<br />15. FIRM NAME AND LOCATION (City and State)
<br />The Corradino Group, Inc. –Fort Lauderdale, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Master (Public Policy) University of Southern California, 2012
<br />Master (Planning) University of Southern California, 2012
<br />BA (Planning and Public Policy), Rutgers University 2008
<br />American Institute of Certified Planner (AICP) No. 28927
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Ng is the Technical Vice President for Corradino’s Planning Department, with experience in transportation, economic development,
<br />transit-oriented development, and land use planning. His work involves demographic analyses, preparation of and updates to
<br />comprehensive plans, grant writing, land use code revisions, geospatial planning analyses, GIS mapping, public outreach, and analyses
<br />of traffic facilities and operational data.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />Cutler Bay Complete Streets Corridor Analysis
<br />Town of Cutler Bay, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2018 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm
<br />Project Manager. This study developed guidance through the development of street specific cross sections to implement Complete Streets
<br />for four corridors in Cutler Bay (NW 87th Avenue, Marlin Road, Gulfstream Road, and Franjo Road), based on the Town’s roadways
<br />characteristics, current conditions and pedestrian, bicycle and transit facilities. Additionally, policies related to implementation were
<br />reviewed to provide recommendations for changes to the local code of ordinances.
<br />b.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />City of Homestead General Services
<br />Homestead, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2014 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm
<br />Senior Planner. Evaluates existing ordinances and assists in ordinance revisions as needed. Provides staff reports on impact analyses of
<br />proposed changes. Provides GIS support as needed by client. Performs QA/QC of maps, database updates, and provides ArcGIS technical
<br />advice to client. Reviewed site plans and over 100 zoning change ordinances adopted by the City of Homestead between 1993 and 2014
<br />in order to incorporate all zoning changes into an updated and current zoning map. Reviewed and updated Future Land Use map.
<br />c.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />Unified Bicycle/Pedestrian Master Plan
<br />Aventura, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2016-2017 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm
<br />QA/QC Officer. This project involved reviewing existing bicycle and pedestrian planning needs in the City of Aventura, FL. Responsible for
<br />developing the final project list and for overall QA/QC of the technical aspects of the report.
<br />d.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />City of Hallandale Beach Transit Mobility Plan
<br />Hallandale, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />? N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm
<br />Project Manager. This project evaluated the City’s prior Transportation Master Plan, with updates to local LOS determinations, intersection
<br />analyses, and planning for transit, pedestrian, and bicycle facilities. The analysis particularly focused on creating a new primary and
<br />secondary bicycle infrastructure grid, incorporated basis of design reports and local district planning, and included recommendations for
<br />new roadways transit system development.
<br />e.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />City of Miami Beach NoBe Ocean Terrace Neighborhood Urban Design
<br />Plan
<br />North Miami Beach, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />? N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm
<br />Prime Consultant/Project Manager. This study builds upon the City’s prior visioning for the North Beach area of Miami Beach. Specifically,
<br />this plan focuses on an urban design plan for the Ocean Terrace neighborhood, which is located adjacent to the North Beach Town Center
<br />neighborhood as envisioned in the City’s NoBe Master Plan.
|