|
34
<br />SECTION E Qualification Information and Assigned Personnel
<br />RFQ # 21-11-01 PROFESSIONAL PLANNING AND ZONING CONSULTING SERVICES, CIVIL AND TRAFFIC ENGIEERING
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Mark Alvarez Multimodal and Complete Streets a. TOTAL b. WITH CURRENT FIRM
<br />30 4
<br />15. FIRM NAME AND LOCATION (City and State)
<br />The Corradino Group, Inc. – Miami, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Master (City & Regional Planning) The Ohio State University 1992
<br />BS (Business Operations Management) The Ohio State University 1988 N/A
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Alvarez is a professional planner with 30 years’ experience in transportation planning, land development analysis, infrastructure
<br />programming and environmental impact analysis. He brings his experience together to provide holistic approaches for integrated
<br />solutions toward sustainable and resilient urban development that is focused on developing socially and economically viable mobility
<br />plans that leverage public, business and government resources together.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />Palmetto Bay Interim Planning Director
<br />Village of Palmetto Bay, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />Ongoing N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☐☐ Check if project performed with current firm
<br />Project Manager. Corradino is tasked with the overall planning, administration, management, operations and problem solving of the
<br />Planning & Zoning Division. Mr. Alvarez role is to provide staff support, land use zoning and comprehensive planning for the Village. Recent
<br />projects: concurrency and impact fee review; transit and parking analyses; and assistance with general planning.
<br />b.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />Miami-Dade TPO First-Mile/Last-Mile Mobility Study
<br />Miami-Dade County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2018 N/A
<br />(3) BRIEF DESCRIPTI ON (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm
<br />Project Manager. This study evaluated the state of First Mile/Last Mile (FLM) mobility strategies and infrastructure nationwide. Beyond
<br />reviewing best practices for transference to the Miami-Dade area, the study explored basic urban travel demand assumptions,
<br />infrastructure characteristics and mobility delivery models to develop a basis for a ground-up understanding of how and when to
<br />implement different FLM strategies based on development contexts and primary corridor transit characteristics.
<br />c.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />Central City CRA Zoning Code Rewrite & Land Use Amendment
<br />Fort Lauderdale, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />Ongoing N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm
<br />In progress to rewrite the district zoning code to support the redevelopment plan, stimulate investment in the mixed-use district, support
<br />re-investment in the residential areas, address the commercial strip, and reinvent the warehouse subdistrict. A companion land use plan
<br />amendment is proposed to address its development scale and mixed use limitations.
<br />d.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />Paseo de la Riviera, Coral Gables TOD
<br />City of Coral Gables, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2015 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm
<br />Peer Review of Transit Oriented Development (TOD) proposed for the Metrorail University Station with relevance to: transit-supportive
<br />efficacy; transit station utilization analysis; consistency with FDOT Florida TOD Guidebook and national best practices; area and
<br />neighborhood compatibility; consistency with the City’s Comprehensive Plan and zoning code; and community input at charrette and
<br />visioning processes.
<br />e.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />Title Drive Electric Florida, Volume II
<br />Miami-Dade County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2014 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm
<br />Project Manager. Developed a detailed feasible plan for a demonstration project to provide electric, shared vehicles to complete the “last
<br />mile” for MetroRail stations, with the dual purposes to introduce electric vehicles (EV) to increase their market penetration and increase
<br />transit usage. Additionally, performed a preliminary feasibility analysis to utilize battery-electric buses along the Busway. Work included
<br />extensive quantitative market analysis, EV transit infrastructure planning, and national benchmarking of car sharing programs.
<br />
|