Laserfiche WebLink
35 <br />SECTION E Qualification Information and Assigned Personnel <br />RFQ # 21-11-01 PROFESSIONAL PLANNING AND ZONING CONSULTING SERVICES, CIVIL AND TRAFFIC ENGIEERING <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Gorky Charpentier, PE, CGC Civil Environmental Engineering a. TOTAL b. WITH CURRENT FIRM <br />30 <1 <br />15. FIRM NAME AND LOCATION (City and State) <br />TThhee CCoorrrraaddiinnoo GGrroouupp,, IInncc.. –– MMiiaammii, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> B.S., Civil Engineering Catholic University of Ecuador, 1987 <br /> Professional Engineer, Florida (47523) 1994 Certified General Contractor, Florida (CGC061113 ) 2000 Standard Inspector, Florida (1996) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Gorky Charpentier has more than 30 years of experience in design and management of transportation and municipal projects during <br />design and construction stages. His Florida Department of Transportation (FDOT) and Municipal experience includes the <br />management of groups and team. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Brightline At-Grade Railroad Crossings PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />22002211 22002233 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☐☐ Check if project performed with current firm <br />Roadway Lead. Responsible for modifications to all the intersecting roads with the FEC railroad tracks on Palm Beach County, Martin <br />County and St. Lucie County. The scope included roadway, signing and pavement marking and construction layout plans for 74 railroad <br />crossings. <br />b. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Golden Glades Interchange – Master TCP Development, Miami-Dade County <br />Miami, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />22001199 22002255 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☐☐ Check if project performed with current firm <br />Manage the development of a Master TCP design for the Golden Glades Interchange; a $600M interchange project consisting of a total <br />of nine segments being designed by six different engineering firms for the Florida Department of Transportation District 6. Analyze TCP <br />design alternatives for constructability and feasibility while maximizing safety and minimizing impacts to the traveling public. Managed a <br />robust team of engineers to identify project constraints including complex bridge construction, night-time interstate roadway pavement <br />reconstruction, and continual maintenance of access to Express Lanes during all phases of construction. <br />c. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />NE 203 St, Roadway Intersection Improvements between SR 5/US-1 and West <br />Dixie Highway <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2021 2024 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☐☐ Check if project performed with current firm <br />The project consists of the removal of an at-grade vehicle and pedestrian railroad crossing, the construction of two new ramp bridges, <br />widening of an existing bridge and the construction of a pedestrian bridge. In addition, there are multiple signal, lighting and drainage <br />improvements. <br /> <br />d. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />SR 826/Palmetto Expressway Project from SR 924/I-75 Interchange to west of <br />NW 17 Avenue in Miami-Dade County <br />Miami, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2019 On hold <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☐☐ Check if project performed with current firm <br />Owner’s Representative in charge of coordinating the design among the 6 different consultants. The services included to provide General <br />Engineering Consultant services as needed to support the Department in the management of and submittal of this project. The scope <br />included but not limited to submittal reviews, analysis of design issues, coordination with District Design Engineer, Public Presentations, <br />etc. This project includes the reconstruction of SR 826 to provide three general purpose lanes, auxiliary lanes and express lanes in each <br />direction from I-75 to I-95. <br />e. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />I-4 Ultimate Public Private Partnership, FDOT District 5, Design-Build <br />Orange County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2017 2023 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☐☐ Check if project performed with current firm <br />The project consists of reconstruction of a 21-mile section of I-4. Responsible for the QA/QC of Roadway and TCP documents in Area 4 <br />(Maitland Blvd to SR 434).