|
36
<br />SECTION E Qualification Information and Assigned Personnel
<br />RFQ # 21-11-01 PROFESSIONAL PLANNING AND ZONING CONSULTING SERVICES, CIVIL AND TRAFFIC ENGIEERING
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Juan Sotero, PE Evaluation and Design a. TOTAL b. WITH CURRENT FIRM
<br />18 14
<br />15. FIRM NAME AND LOCATION (City and State)
<br />The Corradino Group, Inc. – Miami, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />BS (Civil Engineering), Florida International University, 2001 Professional Engineer, Florida No. 67386
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Professional Affiliations: American Society of Civil Engineers (ASCE); Member, Chi Epsilon – Civil Engineering National Honor Society; Tau
<br />Chi Alpha – Environmental Engineering Honorary.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />FDOT District 6, NW 74th Street (NW 74th Ave. to NW 69th Ave.) and
<br />NW 69th Avenue (NW 74th Street to FEC Hialeah Railyard Entrance)
<br />Miami-Dade County, FL*
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />Ongoing 2023
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm
<br />Project Engineer. The scope of this project consists on reconstruct Local NW 74th Street from NW 74th Avenue to SR 969 / NW 72nd
<br />Avenue / Milam Dairy Road and will also perform RRR improvements including milling and resurfacing on Local NW 74th Street from SR
<br />969 to NW 69th Avenue. The project will also reconstruct NW 69th Avenue from Local NW 74th Street to the Hialeah FEC Rail Yard Entrance.
<br />and upgrading pedestrian ramps to comply with ADA standards. Responsible for designing roadway improvements including
<br />reconstruction, milling and resurfacing, pavement markings, and sidewalks/curb ramps to comply with ADA standards, preparing the
<br />Flexible Pavement Design Package, Design Exceptions, and Design Variations.
<br />b.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />FDOT District 6, I-75 Express Lanes from County Line to SR-826
<br />Miami-Dade County
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2015 2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm
<br />Project Engineer. Responsible for the design and plans preparation for design build RFP documents. The scope consisted in the adding two
<br />express lanes in the I-75 median with an egress and an ingress access point.
<br />c.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />FDOT District 6, SR 826/Palmetto Expressway RRR
<br />Miami-Dade County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2015 2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm
<br />Project Engineer. responsible for the design and preparation of contract documents detailing the RRR of SR 826/Palmetto Expressway
<br />from its southern terminus at SR 5/US 1/S. Dixie Highway (MP 0.000) to just north of SR 878/Snapper Creek Expressway (MP 1.343). The
<br />project also includes the upgrading of substandard guardrail terminals, replacement of guardrail to bridge railing transitions (Bridge
<br />870129), upgrading of bridge railing with vertical face retrofit (Bridge 870129), replacement of bridge expansion joints and replacement
<br />of all pavement markings.
<br />d.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />FDOT District 6, RRR Project - SR 909 (West Dixie Highway) from North
<br />of NE 151st Street to SR 826/NE 163rd Street, Miami-Dade County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2014 2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm
<br />The scope of this project consisted on milling and resurfacing, improvements of pavement markings, and upgrading sidewalks and curb
<br />ramps to comply with the accessibility standards and requirements set forth in the Americans with Disability Act of 1990 (ADA). Project
<br />Responsibilities: Project Manager, responsible in the design of the roadway improvements for this corridor that includes milling and
<br />resurfacing, improvement of pavement markings, installations of count-down pedestrian signals and upgrading sidewalks and curb rumps
<br />to comply with ADA standards.
<br />e.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />Coral Reef Elementary Safe Routes to School
<br />Palmetto Bay, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2013 2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm
<br />Project Roadway Engineer. Responsible for the design and plans preparation for design build RFP documents. The scope consisted in
<br />providing sidewalk, ADA standards, and pavement marking improvements for the pedestrian accessing Coral Reef Elementary School in
<br />the Village of Palmetto Bay. The project was part of FDOT local agency programs.
|