Laserfiche WebLink
37 <br />SECTION E Qualification Information and Assigned Personnel <br />RFQ # 21-11-01 PROFESSIONAL PLANNING AND ZONING CONSULTING SERVICES, CIVIL AND TRAFFIC ENGIEERING <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) Pg 1 <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Marvin Guillen, EI Roadway Complete Streets Design a. TOTAL b. WITH CURRENT FIRM <br />30 26 <br />15. FIRM NAME AND LOCATION (City and State) <br />The Corradino Group, Inc. – Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS (Civil Engineering, University of Miami, FL, 1987 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Guillen has 25 years of experience in the field of Civil Engineering. He has vast experience in highway design and municipal roadway street design. He has prepared Technical Special Provisions and processed all the necessary permits for the construction of several projects. He has been the Design Engineer for several interchanges for the Florida Department of Transportation and the designer of several roadway street projects for the city of Hialeah and Miami-Dade County. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Oceana Bal Harbour Signalization Improvements <br />Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Ongoing Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm <br />Project Engineer. This project required engineering and permitting services with a complete set of construction documents and all required <br />permits required to construct the required signalization modification at the intersection of SR A1A / Collins Avenue and Harbor Way to <br />accommodate the proposed condominium development named the Oceana Bal Harbour. Work included the relocation of the pedestrian <br />signalization from the existing mast arms to proposed pedestrian signal pedestals located adjacent to the new crosswalk locations; new mast <br />arm and signalization controlled to replace the mast that is in conflict with the proposed north driveway to the property; replacement of all <br />signalization loops that are damaged by any of the roadway construction; Signal Operating Plan modifications as required through Miami- <br />Dade County Public Works and Waste Management Department’s Traffic Signals and Signs Division. <br />b. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />SR-907 / Alton Road Reconstruction <br />Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Ongoing Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm <br />Project Engineer. Responsible for assisting in the design and preparation of the Traffic Control Plans detailing the maintenance of vehicular <br />and pedestrian traffic during the reconstruction of SR 907/Alton Road. The Traffic Control Plan from 43rd Street to Pine Tree Drive consists of <br />a 3 Phase approach which proposes a large/safe work zone while decreasing overall construction time. This segment also includes traffic <br />crossovers and temporary signalization. The Traffic Control Plan from Pine Tree Dr. to east of Allison Rd. consists of a 4 Phase approach which <br />also includes temporary signalization and details for the proper/safe maintenance of traffic upstream and downstream of a bascule bridge <br />adjacent to the project terminus. <br />c. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />SR-826 / Palmetto Expressway RRR <br />Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2015 2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm <br />Project Engineer. Responsible for the design and preparation of contract documents detailing the RRR of SR 826/Palmetto Expressway from <br />its southern terminus at SR 5/US 1/S. Dixie Highway to just north of SR 878/Snapper Creek Expressway. The project also includes the <br />upgrading of substandard guardrail terminals, replacement of guardrail to bridge railing transitions (Bridge 870129), upgrading of bridge <br />railing with vertical face retrofit (Bridge 870129), replacement of bridge expansion joints and replacement of all pavement markings. <br />d. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />SR-997/Krome Avenue Interim Resurfacing <br />Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2015 2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm <br />Project Engineer. Responsible for the design and preparation of contract documents detailing the maintenance resurfacing on 6 segments of <br />SR 997/Krome Avenue from SW 297th Street to SW 136th Street. Two of the projects are classified as RRR (434930-2 and 434930-6) and the <br />other four projects are classified as Pavement Only Projects (POP). These project are being performed in order to maintain and adequate <br />Pavement Condition Survey Rating prior to the widening of the SR 997/Krome Avenue corridor that will take place in 2021-2022. <br />e. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />FDOT D6, I-75 Express Lanes from County Line to SR-826 <br />Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2013 2013 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm <br />Project Engineer. Responsible for the design and plans preparation for design build RFP documents. The scope consisted in the adding two <br />express lanes in the I-75 median with an egress and an ingress access point. <br />