My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(21-11-01) Professional Planning and Zoning Consulting Services including Civil and Traffic Engineering CCNA FINAL.doc
>
RESPONSES
>
The Corradino Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2021 11:05:15 AM
Creation date
12/3/2021 3:52:27 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Planning and Zoning Consulting Services
Bid No. (xx-xx-xx)
21-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
57 <br />SECTION E Qualification Information and Assigned Personnel <br />RFQ # 21-11-01 PROFESSIONAL PLANNING AND ZONING CONSULTING SERVICES, CIVIL AND TRAFFIC ENGIEERING <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br /> <br />20. EXAMPLE PROJECT KEY NUMBER <br />3 <br />21. TITLE AND LOCATION (City and State) <br />Town of Cutler Bay General Planning Services <br />Cutler Bay, FL <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2007 <br />CONSTRUCTION (If applicable) <br />N/A <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER <br />Town of Cutler Bay <br />b. POINT OF CONTACT NAME <br />Rafael Casals, Town Manager <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />305.234.4262 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />Project Description: The Corradino Group is providing a variety of transportation, planning, and general services for the Town of <br />Cutler Bay that include: <br /> <br />• Site Plan Reviews <br />• Land Development Regulation Review and Amendments <br />• Comprehensive Planning <br />• Public Involvement and Consensus Building <br />• Data Collection <br />• Level of Service Determination <br />• Travel Demand Forecasting <br />• Alternatives Analysis and Evaluation <br />• Preparation of Maps, Reports, and Presentations <br /> <br />Since its incorporation in 2005, The Corradino Group has acted as the Town’s initial Planning Director, Planning Staff, and <br />Transportation Consultant. We continue to serve as the Town’s General Planning Consultant assisting with a wide variety of <br />tasks. Corradino developed the Town of Cutler Bay Comprehensive Plan, Land Development Regulations, Bicycle and Pedestrian <br />Master Plan, Transportation Master Plan, and Complete Streets Corridor Analysis, among other studies. Through a series of <br />detailed and highly graphic reports and presentations, Corradino has been able to build consensus on a list of projects for <br />inclusion into the Town’s Capital Improvement Program. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. (1) FIRM NAME <br />The Corradino Group, Inc. <br />(2) FIRM LOCATION (City and State) <br />Miami, FL <br />(3) ROLE <br />Prime <br />
The URL can be used to link to this page
Your browser does not support the video tag.