Laserfiche WebLink
h. <br />19. RELEVANT PROJECTS (CONT.) <br />f. <br />e. <br />d. <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 HeiDi HeNDeRSON <br />Wawa at 2401 S. Kanner Highway <br />Stuart, Florida <br />Miss Henderson was the Project Manager and Engineer of Record for the project and worked closely with the City of Stuart through <br />the Rezoning and Land Use Amendment process for the Planned Unit Development (PUD). Miss Henderson also worked closely with <br />the South Florida Water Management District and Florida Department of Transportation to satisfy their stormwater management design <br />criteria as the project site was located in a Flood Zone and discharged into an impaired water body which lead to having to provide nutrient <br />removal prior to discharging into FDOT ROW. In addition, historical flows drained onto the PUD so a master stormwater management <br />system was implemented for the remaining lots. Provided construction administration services and certified the project. <br />06/2013-06/2017 <br />Wawa at SW 137th Avenue and SW 120th Street <br />Miami, Florida <br />As the Engineer of Record and Project Manager, Miss Henderson was responsible for the site layout including ADA accessibility, civil <br />engineering design and permitting for the parking lot, proposed utilities, stormwater management system. The stormwater management <br />system was composed of exfiltration trench and a retention pond to meet Broward County stormwater criteria. The project required Right- <br />of-Way (ROW) dedications to both the City of Pompano Beach and to FDOT. Permits required were through the City of Pompano Beach, <br />FDOT Driveway and Drainage, Broward County Water and Wastewater, Broward County Surface Water Management Program, FDEP, and <br />FDOH. Provided construction administration services and certified the project. <br />01/2014-08/2017 <br />Wawa at 10308 S.W. Tradition Parkway <br />Port St. Lucie, Florida <br />Miss Henderson was the Project Manager and Engineer of Record for the project and worked closely with the City of Port St. Lucie and <br />Tradition. Miss Henderson was responsible for meeting with the Village of Tradition and the City of Port Saint Lucie concerning all aspects <br />of the project such landscape, lighting, architecture, and civil design; relaying the Village’s and the City’s needs to the Design Team and <br />Wawa, and implementing a design that all parties would approve. Provided construction administrative services and certified the project. <br />01/2014-07/2017 <br />Wawa at 590 Ne 167th Street <br />North Miami, Florida <br />Similar to the efforts for the Wawas listed above, Miss Henderson was the Project Manager and Engineer of Record for the design and <br />permitting of the site; responsible for the water, sewer, and stormwater layout of 15-foot deep exfiltration trench; required a Zoning <br />hearing for a rezoning and signage variance; required platting via Miami-Dade County. However, this site had to be phased in order to <br />demolish the existing Ham and Eggery to construct a new Krispy Kreme while the existing Krispy Kreme is in business, then demolish <br />the existing Krispy Kreme and construct the Wawa. Thus, extensive coordination with Wawa, Krispy Kreme and the design team was <br />required for the phasing of construction. Permitting through the City of North Miami Beach Utilities, WASD, Miami-Dade County Public <br />Works, Miami-Dade County Fire Department, FDOT Driveway and Drainage, FDEP, and FDOH was required. <br />01/2015-12/2017 <br />45