Laserfiche WebLink
h. <br />19. RELEVANT PROJECTS (CONT.) <br />f. <br />e. <br />d. <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 JeNNA MARTiNeTTi <br />Fronton Boulevard improvements <br />Dania Beach, Florida <br />Senior Project Manager for the improvements to Fronton Boulevard in order to upgrade the existing Jai-alai facility to accommodate a <br />casino. Redesign of this City owned roadway was required as part of the developer’s agreement with the City. Upgrades on Fronton Blvd <br />were accomplished by alignment changes in order to add a median as well an additional southbound lane, new parking for the adjacent <br />park, and two new right turn lanes and entrances to the facility. Design, permitting, and construction services for the improvements <br />as well as new offsite water mains on Fronton Blvd, SR A1A/Dania Beach Blvd and NE 2nd Street; overall coordination of utilities; and <br />drainage design to accommodate the roadway improvements was performed. Construction Cost - $3.1 Million, Professional Fees - <br />$766,000 <br />2013 - 2016 2016 <br />Rolling Oaks Park <br />Miami Gardens, Florida <br />Senior civil project manager for the design and construction of an ADA-compliant pedestrian trail and associated retention areas <br />within Rolling Oaks Park. Wayfinding signage and ADA ramps were provided at the intersections along a route through the surrounding <br />neighborhood to connect the new trail in the park to an existing walking trail in the Dolphin Center Park, which is located three quarters <br />of mile away. In addition, the existing drainage permit for the master site plan had to be modified to account for the proposed trail <br />improvements. These new drainage facilities were carefully planned to avoid removing any trees as well as limit impacts to the future <br />master plan for the park. The design for the trail included new outdoor fitness stations, seating areas, LED site lighting and custom- <br />designed way-finding signage for all of the trailhead signs, directional signs, and mile markers. <br />2012 - 2015 2015 <br />SR 870/Commercial Boulevard, FDOT District iV <br />Tamarac, Florida <br />Project manager for the design, permitting and post design services for this FDOT RRR project. The scope includes milling and resurfacing, <br />signing and pavement markings, signalization and lighting upgrades at two intersections, ADA upgrades, safety improvements, traffic <br />monitoring sites, and utility coordination. Phase 1 was complete in 2014 and Phase 2 was completed in 2016. <br />2011 - 2016 2016 <br />Windmill Park <br />Coconut Creek, Florida <br />Senior Project Manager for the design of a 14 acre redevelopment to an existing park. Subconsultant to the architect for the site design <br />modifications including ADA sidewalks, exercise stations, a new parking lot and parking lot improvements, pavement marking and <br />signage, stormwater management, grading, stormwater pollution prevention, and utilities modifications to accommodate a reconstructed <br />office building and dog park. <br />2015 - 2017 2018 <br />Dania Cove Park improvements <br />Dania Beach, Florida <br />Project manager for the design and installation of park improvements including a pedestrian pathway, 2 picnic pavilions, benches, <br />picnic tables, educational and entrance signage, and trash receptacles for Dania Cove, aka Fuzzy Bunny Park, in Dania Beach. The city <br />needed design, permitting and construction completed in 13 months in order to meet the deadline for two separate grants funding the <br />project. The project also included shoreline restoration using sheet pile wall, environmental and stormwater permitting, site grading, <br />grant administration, and landscaping improvements. The project was completed in time for the City to receive the entire grant funding <br />available for reimbursement. <br />2010 - 2012 2012 <br />51