h.
<br />19. RELEVANT PROJECTS (CONT.)
<br />f.
<br />e.
<br />d.
<br />g.
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />STANDARD FORM 330 (REV. 8/2016) - SF330 JeNNA MARTiNeTTi
<br />Fronton Boulevard improvements
<br />Dania Beach, Florida
<br />Senior Project Manager for the improvements to Fronton Boulevard in order to upgrade the existing Jai-alai facility to accommodate a
<br />casino. Redesign of this City owned roadway was required as part of the developer’s agreement with the City. Upgrades on Fronton Blvd
<br />were accomplished by alignment changes in order to add a median as well an additional southbound lane, new parking for the adjacent
<br />park, and two new right turn lanes and entrances to the facility. Design, permitting, and construction services for the improvements
<br />as well as new offsite water mains on Fronton Blvd, SR A1A/Dania Beach Blvd and NE 2nd Street; overall coordination of utilities; and
<br />drainage design to accommodate the roadway improvements was performed. Construction Cost - $3.1 Million, Professional Fees -
<br />$766,000
<br />2013 - 2016 2016
<br />Rolling Oaks Park
<br />Miami Gardens, Florida
<br />Senior civil project manager for the design and construction of an ADA-compliant pedestrian trail and associated retention areas
<br />within Rolling Oaks Park. Wayfinding signage and ADA ramps were provided at the intersections along a route through the surrounding
<br />neighborhood to connect the new trail in the park to an existing walking trail in the Dolphin Center Park, which is located three quarters
<br />of mile away. In addition, the existing drainage permit for the master site plan had to be modified to account for the proposed trail
<br />improvements. These new drainage facilities were carefully planned to avoid removing any trees as well as limit impacts to the future
<br />master plan for the park. The design for the trail included new outdoor fitness stations, seating areas, LED site lighting and custom-
<br />designed way-finding signage for all of the trailhead signs, directional signs, and mile markers.
<br />2012 - 2015 2015
<br />SR 870/Commercial Boulevard, FDOT District iV
<br />Tamarac, Florida
<br />Project manager for the design, permitting and post design services for this FDOT RRR project. The scope includes milling and resurfacing,
<br />signing and pavement markings, signalization and lighting upgrades at two intersections, ADA upgrades, safety improvements, traffic
<br />monitoring sites, and utility coordination. Phase 1 was complete in 2014 and Phase 2 was completed in 2016.
<br />2011 - 2016 2016
<br />Windmill Park
<br />Coconut Creek, Florida
<br />Senior Project Manager for the design of a 14 acre redevelopment to an existing park. Subconsultant to the architect for the site design
<br />modifications including ADA sidewalks, exercise stations, a new parking lot and parking lot improvements, pavement marking and
<br />signage, stormwater management, grading, stormwater pollution prevention, and utilities modifications to accommodate a reconstructed
<br />office building and dog park.
<br />2015 - 2017 2018
<br />Dania Cove Park improvements
<br />Dania Beach, Florida
<br />Project manager for the design and installation of park improvements including a pedestrian pathway, 2 picnic pavilions, benches,
<br />picnic tables, educational and entrance signage, and trash receptacles for Dania Cove, aka Fuzzy Bunny Park, in Dania Beach. The city
<br />needed design, permitting and construction completed in 13 months in order to meet the deadline for two separate grants funding the
<br />project. The project also included shoreline restoration using sheet pile wall, environmental and stormwater permitting, site grading,
<br />grant administration, and landscaping improvements. The project was completed in time for the City to receive the entire grant funding
<br />available for reimbursement.
<br />2010 - 2012 2012
<br />51
|