My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CGA_RFQ_Sunny Isles Planning_Final Version
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(21-11-01) Professional Planning and Zoning Consulting Services including Civil and Traffic Engineering CCNA FINAL.doc
>
RESPONSES
>
CGA
>
CGA_RFQ_Sunny Isles Planning_Final Version
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2021 11:04:38 AM
Creation date
12/3/2021 4:00:49 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Planning and Zoning Consulting Services
Bid No. (xx-xx-xx)
21-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h. <br />19. RELEVANT PROJECTS (CONT.) <br />f. <br />e. <br />d. <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 JeNNA MARTiNeTTi <br />Water Main Replacement on Ne 2nd Avenue <br />Dania Beach, Florida <br />Engineer of Record for the replacement of about 7,000 LF of 12” water main plus some 4-inch, 6-inch, and 8-inch water main with tie <br />ins in a residential neighborhood including replacing all water services, connections to the existing main, and fire hydrants. <br />2020 - Ongoing <br />Hallandale Beach SW Quadrant Drainage improvements <br />Hallandale Beach, Florida <br />Senior Project Manager for major enhancements to the existing drainage system within the City’s SW Quadrant to reduce the flooding <br />during large storm events by isolating the system from tidal influence and pumping the stormwater into proposed injection wells. The <br />project includes the construction of a new pumping station with two (2)- 350 HP pumps and an automated trash rack, storm water force <br />mains, seventeen (17) injection wells, a control structure consisting of four (4) flap gates and one sluice gate, an 800 kW generator, an <br />intelligent controls and monitoring system and landscaping enhancements in areas affected by construction This project is funded by <br />FEMA HMGP grant funds. Client: Manga Ebbe. (954) 457-3042. Construction Cost: $9.6 million, Firm Fees: $782,395. <br />2014 - Ongoing <br />Dania Casino and Jai-Alai Off-site Water Main Upgrades <br />Dania Beach, Florida <br />Senior Project Manager for design for the onsite and offsite improvements required to upgrade the existing Jai-alai facility to accommodate <br />a casino. As part of the developer’s requirement with the City and the demand of the upgraded facility, new water distribution lines <br />surrounding the site area were required to be installed. Design and permitting for 1570 LF of 8” pipeline, 1270 LF of 12” pipeline, new <br />fire hydrants both onsite and offsite, and multiple new service and irrigation connections for the project site. City, Health Department <br />and FDOT permitting and certifications were required for the new water main. Client Reference: F3 Architecture, Joaquin Gerlero. Water <br />owner/supplier: City of Dania Beach <br />2013 - 2016 2016 <br />Broad Causeway LAP Project <br />Bay Harbor Islands, Florida <br />Senior project manager for design and construction document preparation for adding a paved shoulder to the Causeway and replacing <br />the pedestrian handrail along the waterways bridge. The project is an FDOT Local Agency Program (LAP) funded project requiring <br />coordination and submittals to FDOT D6, including using their electronic review comment (ERC) system, as required due to the federal <br />funding. Assisting the Town with their LAP Certification process is also included. <br />2017 Ongoing <br />Rickenbacker Causeway <br />Miami-Dade County, Florida <br />In-house project manager as a sub-consult for the design build team with Kiewit Construction for the rehabilitation of the Rickenbacker <br />Causeway’s West Bridge and the rehabilitation and expansion of the Bear Cut Bridge. CGA’s scope included hydrographic and topographic <br />survey, drainage design, lighting, and signing and pavement markings. The Bear Cut Bridge was widened to accommodate a protected <br />multi-use path in both directions and an 8’ bike lane adjacent to traffic in both directions as well as improvements to both approaches <br />requiring coordination with two of the County’s adjacent future projects. The existing cross slope and bridge deck structure were modified <br />impacting the existing drainage and requiring permits through Miami Dade County’s Regulatory & Economic Resources Department and <br />South Florida Water Management District. CGA coordinated the bridge circuits during construction as well as providing new lighting for <br />the widened bridge and new multi-use paths. <br />2013 - 2014 2014 <br />52
The URL can be used to link to this page
Your browser does not support the video tag.