Laserfiche WebLink
h. <br />19. RELEVANT PROJECTS (CONT.) <br />f. <br />e. <br />d. <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 JeNNA MARTiNeTTi <br />Sage Beach Condominium <br />Hollywood, Florida <br />Project Manager and EOR for civil site design for condominium complex located east of A1A on Hollywood Beach. Design and permitting <br />included replacement of the water main, coordination of utilities, drainage design including a closed system with drainage wells and <br />exfiltration trench as well as offsite roadway improvements for the two sites separated by South Surf Road. All utilities along Iris Terrace, <br />Jasmine Terrance and South Surf Road adjacent to the project site were undergrounded. The offsite improvements were coordinated with <br />the City CRA to incorporate the design features consistent with the City’s beach beautification projects. <br />2012 - 2016 <br />Hallandale CRA Resiliency Demonstration Parking Lot <br />Hallandale Beach, Florida <br />The CRA owns a vacant lot at the NE corner of NE 3rd St and NE 2nd Ave and wanted to construct a parking lot that is a sustainable yet <br />simple design in order to showcase the resiliency elements they desire from new developers. CGA provided two schematic layouts for <br />the parking lot for the City to decide which conceptual layout they wanted. CGA met the City’s request to showcase a sustainable parking <br />lot and to avoid drainage infrastructure by utilizing a combination of bioswales, pervious concrete, and a permeable paving system. LED <br />lighting, electric vehicle charging stations, native plantings, and bike racks were also included in the design. Additionally, the design <br />layout of the parking lot and spaces allows for the City’s potential conversion of the parking lot to a valet lot with mechanically stacked <br />parking and a valet station. The plans were approved by City and CRA staff and permitting through Broward County Environmental <br />Protection and Growth Management (EPGM) Division <br />2019 - Ongoing <br />SR 820/Pines Blvd and i-75 interchange Urbanization and Ramp Realignment (LAP) <br />Pembroke Pines, Florida <br />Lead designer for signing and pavement marking plans for the reconfiguration of the I-75 interchange at Pines Boulevard including new <br />ramp alignment, design of cantilever signs, incorporation of bike lanes on Pines Boulevard and new signalized intersections. <br />2006 - 2011 2011 <br />SR 820 / Pines Boulevard <br />Broward County, Florida <br />Roadway design including adding an additional through lane, adjusting medians, adding bus bays, drainage modifications, ADA upgrades <br />and milling and resurfacing. Signing and pavement marking design for Pines Boulevard including reconfiguration of two mall entrances. <br />Overall project coordination including preparing roadway and signing and pavement marking plans, calculating quantities using Geopak, <br />participating in QA/QC process, engineering during construction and project close out. This project included multiple projects and <br />funding sources extending from 136th Avenue to Douglas Road, funding included a LAP project, a JPA project, and permit project. FDOT <br />Project Manager: John Thompson 954.777.4680 <br />2004 - 2008 <br />53