Laserfiche WebLink
m. <br />19. RELEVANT PROJECTS (CONT.) <br />k. <br />j. <br />i. <br />l. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 NichOlAS KANeliDiS <br />Ne 57th Street Water Main Replacement <br />Fort Lauderdale, Florida <br />Project Manager for a residential water main replacement project where water quality and age of existing infrastructure were the primary <br />issues. Approximately 1,850 linear feet of a new looped system was designed and constructed. Project tasks included design, checking <br />compliance with local and state standards, permitting, conducting routine inspections, reviewing test reports and as-builts, and final <br />project certification. <br />2015 - 2016 2016 <br />lift Station No. 52 Rehabilitation <br />Cooper City, Florida <br />Project Manager for a municipal sewer pump station rehabilitation project. Improvements were needed due to the expiring service life <br />of the pumps and their insufficient operating capacity during peak flows and significant rain events. Tasks included design, permitting, <br />interpreting pressure data logger readings, hydraulic calculations, coordinating with pump manufacturers, existing sewer flow analysis, <br />monitoring geotechnical work, and coordinating with other professional disciplines. <br />2015 - 2016 2016 <br />lift Station No. 21 Replacement <br />Cooper City, Florida <br />Project Manager for a municipal sewer pump station replacement project. The station is located within an HOA and required mechanical, <br />aesthetic, and immediate odor control improvements. Due to its proximity with adjacent residences and frequent odor complaints, the <br />station was relocated across the street. This required a sewer conveyance, landscape, and irrigation redesign. Tasks included design, <br />permitting, setting up pressure data loggers, hydraulic calculations, coordinating with pump manufacturers, existing sewer flow analysis, <br />preparing technical specifications, permitting, shop drawing reviews, addressing Contractor RFI’s, conducting routine inspections, and <br />final project certification. <br />2015 - 2018 2017 - 2018 <br />lloyd estates industrial and Residential improvements <br />Oakland Park, Florida <br />Project Engineer for the design and modification of a stormwater conveyance system to improve flooding within the Lloyd Estates <br />Neighborhood. The project included a stormwater pump station and floodgates for major storm events along with new stormwater <br />structures and exfiltration trenches. New seawalls were designed and constructed downstream of the station that ultimately discharged <br />to the ocean via the South Florida Water Management District (SFWMD) C-13 Canal. The pump station site provided means for erosion <br />control that included rip-rap design. CGA also coordinated and assessed the environmental impacts with SFWMD and the Army Corps of <br />Engineers. In addition to stormwater discharge improvements, several areas included upgrades to the water distribution system for fire <br />protection services. The project funding was driven by a FEMA grant. <br />2013 - 2017 2016 - 2017 <br />Bid Pack 9 infrastructure improvements <br />Oakland Park, Florida <br />Project Engineer during the construction phase of a large scale infrastructure improvements project that included replacement of three <br />municipal lift stations, approximately 20,000 linear feet of water main, 5,600 linear feet of force main, over 200 catch basins, and <br />numerous exfiltration trenches and conveyance piping throughout the 500 acre project area. Responsibilities included shop drawing <br />reviews, attending progress meetings, general engineering during construction, reviewing as-builts, validating and negotiating change <br />orders, and coordinating final project certifications. <br />2011 - 2017 2015 - 2017 <br />58