Laserfiche WebLink
r. <br />19. RELEVANT PROJECTS (CONT.) <br />p. <br />o. <br />n. <br />q. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 TAMMy COOk-WeeDON <br />Chaminade Catholic High School <br />Hollywood, Florida <br />CGA redesigned and updated the existing playing fields of this coed high school and introduced synthetic turf during a time where <br />synthetic turf was not the norm. The result has been outstanding as the special drainage system designed into the layout quickly removes <br />water and allows for play to resume at a much faster rate than standard grass fields. Landscape Architect: Responsible for the oversight <br />of the synthetic turf details, hardscape and planting and irrigation. Cost: $85,000.00 <br />2004 <br />SW 9th Avenue and 1st Street <br />Delray Beach, Florida <br />This site will serve as a public parking for the local neighborhood and provide a pocket park. The 44-space lot is a green design, <br />consisting of pervious pavers, decorative LED lighting and low-volume irrigation. The site provides a tot lot for the local community and <br />includes both adult fitness equipment and children’s play equipment. The design includes trash receptacles and a bike rack. <br />2014 N/A <br />Pineapple Grove Parking Lot <br />Delray Beach, Florida <br />Landscape Architect: Ms. Cook-Weedon was involved in the design and permitting of a 14-space parking lot in the Pineapple Grove Art <br />district featuring pervious paver parking and pedestrian surfaces for the City of Delray Beach CRA. <br />2009 N/A <br />Miramar Lakes Community Development District <br />Estero, Florida <br />Provide landscape renovations and restoration plans. <br />Ongoing N/A <br />Hickory Point Recreational Facilities <br />Tavares, Florida <br />Landscape Architect. The project consisted of the site design of a waterfront park that included marinas, boat ramps, wetland educational <br />boardwalks, environmental signage, fishing stations and a communal pavilion. Cost: $220, 000.00. Construction cost estimated at $2.5 <br />million <br />1992 1996 <br />66