Laserfiche WebLink
m. <br />19. RELEVANT PROJECTS (CONT.) <br />k. <br />j. <br />i. <br />l. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 TAMMy COOk-WeeDON <br />Vista Park <br />Weston, Florida <br />CGA developed the master plan for Vista Park, which is adjacent to Cypress Bay High School. With four soccer fields and four baseball <br />fields, this park is well utilized by Weston residents as well as the high school. Special detailing of the edges of the fields were designed to <br />address the clay and sod areas by creating header curbs to separate those areas. The design, construction documents and construction <br />administration was provided by CGA. Cost: $5.5 Million. <br />2009 <br />kane Concourse Beautification <br />Bay Harbour Islands, Florida <br />Landscape Architect: Responsible for the oversight of hardscape and planting of streetscape improvements for the Town’s business <br />district, including street furnishings, wayfinding, and irrigation. <br />2010 N/A <br />Delray Beach Ne 2nd Avenue <br />Delray Beach, Florida <br />As a subconsultant to Wantman Engineering, CGA provided professional services for Landscape Architecture and Electrical Engineering <br />Streetscape enhancements were provided from Lake Ida Rd. to George Bush Blvd. Decorative street lighting as well as date palms were <br />designed to complement the historic neighborhood of Delray Beach. <br />2016 <br />Delray Beach SW 2nd Street <br />Delray Beach, Florida <br />As a subconsultant to Wantman Engineering, CGA coordinated the bulb-out locations with the Civil Engineer. Roundabouts were developed <br />for Traffic Calming. Landscape Streetscape enhancements provided beautification in the South West neighborhood. The project extended <br />from Swinton to SW 15th Avenue. Construction Cost: $408,000 <br />2014 <br />Sombrero Beach Park <br />Marathon, Florida <br />CGA redesigned the park to expand its programming for recreational uses, enhance its environmental condition as a turtle nesting <br />habitat, and provide new on-site amenities that were sensitive to the architectural character of the Florida Keys. The redesign for the park <br />expanded the program for the park to include extensive, walkable circuits for pedestrian use, children’s playground and play equipment, <br />restroom facilities, new gateway and controlled access features, added picnic shelters, volleyball courts, and multiple-use open public <br />spaces that lend themselves to the personalization of the park by the visitors. Cost: $230,000.00 Construction cost estimated at $2 <br />million. <br />2003 2005 <br />65