Laserfiche WebLink
General Planning <br />Redevelopment Srvcs <br />Arch Visualizations & 3D <br />Water / Wastewater Eng <br />Electrical Engineering <br />Environmental Srvcs <br />Website Development <br />GIS Mapping & Analysis <br />Surveying and Mapping <br />Urban Design Traffic Engineering Constr Admin / CEI <br />Landscape Architecture Civil Engineering Public Outreach <br />20. EXAMPLE PROJECT <br /> KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />21. TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />22. YEAR COMPLETED <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />a. <br />b. <br />c. <br />d. <br />e. <br />STANDARD FORM 330 (REV. 8/2016) - SF330-F - LA_0176_NOvA DRive iMpROveMeNTS <br />In-house CGA services provided for this project: <br />2018 2020 <br />07 <br />TOWN OF DAvie <br />Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and <br />all in-house services identified above. <br />Nova Drive improvements <br />Jonathan vogt, pe 954.797.1197 <br />Davie, FL <br />Town Engineer jonathan_vogt@davie-fl.gov <br />APPROXIMATE PROJECT SIZE: <br />PROFESSIONAL FEES: <br />CONSTRUCTION COST: <br />N/A Acres <br />$ 459,475.00 <br />$ 6.3 Million <br />CGA recently completed the design, permitting (SFWMD, CBWCD, THISCD, BC- <br />HCED), and bidding services (2018) for the Nova Drive Improvements project for <br />Town of Davie. The project is currently in construction. The construction scope of <br />work includes 2521 LF of Exfiltration Trench, 4067 LF of RCP (12” to 30” diameter), 75 <br />storm inlets/manholes, regrading of swales, and associated roadway infrastructure <br />improvements. The construction cost is $6.3 million. CGA’s professional services <br />fee for the project is $459,475. <br />The Nova Drive improvements project (from Davie Road to University Drive) included <br />upgrading of the existing roadway with turn lanes, driveway access, bike lanes, and <br />roadway intersection improvements. The project construction completed at the end <br />of 2020. <br />X X <br />X X <br />X <br />X <br />75