My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CGA_RFQ_Sunny Isles Planning_Final Version
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(21-11-01) Professional Planning and Zoning Consulting Services including Civil and Traffic Engineering CCNA FINAL.doc
>
RESPONSES
>
CGA
>
CGA_RFQ_Sunny Isles Planning_Final Version
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2021 11:04:38 AM
Creation date
12/3/2021 4:00:49 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Planning and Zoning Consulting Services
Bid No. (xx-xx-xx)
21-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
General Planning <br />Redevelopment Srvcs <br />Arch Visualizations & 3D <br />Water / Wastewater Eng <br />Electrical Engineering <br />Environmental Srvcs <br />Website Development <br />GIS Mapping & Analysis <br />Surveying and Mapping <br />Urban Design Traffic Engineering Constr Admin / CEI <br />Landscape Architecture Civil Engineering Public Outreach <br />20. EXAMPLE PROJECT <br /> KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />21. TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />22. YEAR COMPLETED <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />a. <br />b. <br />c. <br />d. <br />e. <br />STANDARD FORM 330 (REV. 8/2016) - SF330-F - PL_0065_WiLTONMANORS_LANDDevPLANNiNgSvcS <br />In-house CGA services provided for this project: <br />2017 - 2019 N/A <br />08 <br />ciTY OF WiLTON MANORS <br />Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and <br />all in-house services identified above. <br />comprehensive Plan Update <br />Leigh Ann Henderson 954.390.2120 <br />Wilton Manors, FL <br />City Manager lhenderson@wiltonmanors.com <br />APPROXIMATE PROJECT SIZE: <br />PROFESSIONAL FEES: <br />CONSTRUCTION COST: <br />N/A Acres <br />$ 72,850.00 <br />$ N/A <br />In 2018, The City of Wilton Manors contracted with CGA to prepare the City’s <br />Evaluation and Appraisal Review (EAR) and associated EAR-based amendments to <br />the City’s Comprehensive Plan. A major focus of the Comprehensive Plan update <br />was to incorporate Florida Statute Peril of Flood requirements into the Coastal <br />Management Element and other elements as required. CGA worked closely with the <br />City and DEO staff to complete the update. The Plan was found to be in compliance <br />by DEO in early 2019. <br />In addition, the City wanted sustainability and resiliency strategies related to <br />potential impacts from sea level rise and climate change to be addressed during <br />the Comprehensive Plan update. Numerous resiliency goals, objectives and policies <br />were added to each element of the Plan rather than concentrated in one particular <br />element. <br />Following the completion of the Comprehensive Plan update, CGA worked with the <br />City staff to develop associated amendments to the Unified Land Development Code <br />related to sustainability, resiliency, and climate change. These amendments were <br />adopted by the City Commission in 2020. <br />In addition, the City wanted sustainability and resiliency strategies related to <br />potential impacts from sea level rise and climate change to be addressed during <br />the Comprehensive Plan update. Numerous resiliency goals, objectives and policies <br />were added to each element of the Plan rather than concentrated in one particular <br />element. <br />Following the completion of the Comprehensive Plan update, CGA worked with the <br />City staff to develop associated amendments to the Unified Land Development Code <br />related to sustainability, resiliency, and climate change. These amendments were <br />adopted by the City Commission in 2020. <br />X X X <br />X X X <br />X X X <br />X X X <br />X X X <br />76
The URL can be used to link to this page
Your browser does not support the video tag.