My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NZ Consultants
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(21-11-01) Professional Planning and Zoning Consulting Services including Civil and Traffic Engineering CCNA FINAL.doc
>
RESPONSES
>
NZ Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2021 11:04:59 AM
Creation date
12/3/2021 4:03:35 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Planning and Zoning Consulting Services
Bid No. (xx-xx-xx)
21-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The neighborhood improvements for this substantial infrastructure improvement <br />project included 30,000 linear-feet of water main replacement, moving rear <br />yard services and meters to front yards, 3,200 linear-feet of stormwater system <br />upgrades, pavement reconstruction and overlay, roadside swales, driveway <br />aprons, and sidewalks over a 50-block residential neighborhood covering 193 <br />acres. A critical 6,500 linear-feet sanitary sewer force main connection was also <br />designed that provided connectivity of the City’s sanitary sewer system across the <br />FEC Railroad and Intracoastal Waterway to the barrier island. Installation of the <br />6-inch to 10-inch diameter water and force main utilized a combination of open <br />cut, horizontal directional drill, and pipe bursting construction methods. <br />PROJECT HIGHLIGHTS: <br />•Water main replacement, stormwater system upgrades, driveway aprons, <br />sidewalks, sanitary sewer force main connection design <br />REFERENCE: <br />Chris Roschek <br />City of Boynton Beach <br />124. E. Woolbright Road <br />Boynton Beach, FL 33435 <br />p. 561.742.6413 <br />e. roschekc@bbfl.us <br />SERVICES PROVIDED: <br />Civil <br />PROJECT DATES: <br />Design: November 2017 - February 2018 <br />Construction: April 2018 – Ongoing <br />TOTAL COST: <br />Design Fee $1.2M <br />Construction Fee $13M <br />PROJECT MANAGER: <br />Jimmy Richie, PE <br />KEY STAFF: <br />Brett Oldford, PE <br />Stephen Cherry, PE <br />Chris Holmes, PE <br />SEACREST CORRIDOR UTILITY IMPROVEMENTS PHASE II <br />DESIGN-BUILD <br />Boynton Beach, Florida <br />82
The URL can be used to link to this page
Your browser does not support the video tag.