Laserfiche WebLink
The neighborhood improvements for this substantial infrastructure improvement <br />project included 30,000 linear-feet of water main replacement, moving rear <br />yard services and meters to front yards, 3,200 linear-feet of stormwater system <br />upgrades, pavement reconstruction and overlay, roadside swales, driveway <br />aprons, and sidewalks over a 50-block residential neighborhood covering 193 <br />acres. A critical 6,500 linear-feet sanitary sewer force main connection was also <br />designed that provided connectivity of the City’s sanitary sewer system across the <br />FEC Railroad and Intracoastal Waterway to the barrier island. Installation of the <br />6-inch to 10-inch diameter water and force main utilized a combination of open <br />cut, horizontal directional drill, and pipe bursting construction methods. <br />PROJECT HIGHLIGHTS: <br />•Water main replacement, stormwater system upgrades, driveway aprons, <br />sidewalks, sanitary sewer force main connection design <br />REFERENCE: <br />Chris Roschek <br />City of Boynton Beach <br />124. E. Woolbright Road <br />Boynton Beach, FL 33435 <br />p. 561.742.6413 <br />e. roschekc@bbfl.us <br />SERVICES PROVIDED: <br />Civil <br />PROJECT DATES: <br />Design: November 2017 - February 2018 <br />Construction: April 2018 – Ongoing <br />TOTAL COST: <br />Design Fee $1.2M <br />Construction Fee $13M <br />PROJECT MANAGER: <br />Jimmy Richie, PE <br />KEY STAFF: <br />Brett Oldford, PE <br />Stephen Cherry, PE <br />Chris Holmes, PE <br />SEACREST CORRIDOR UTILITY IMPROVEMENTS PHASE II <br />DESIGN-BUILD <br />Boynton Beach, Florida <br />82