Laserfiche WebLink
REFERENCE: <br />City of Boca Raton <br />Mr. Tony Puerta <br />Chief of Design <br />201 W. Palmetto Park Road <br />Boca Raton, Florida 33432 <br />p. 561.416.3402 / f. 561.416.3418 <br />e. tpuerta@ci.boca-raton.fl.us <br />SERVICES PROVIDED: <br />Civil <br />DATE STARTED: <br />Design 2005 <br />Construction 2006 <br />DATE COMPLETED: <br />Design 2005 <br />Construction 2006 <br />TOTAL COST: <br />Design $370K <br />Construction $3.1M <br />PROJECT MANAGER: <br />Joel Wantman, PE <br />KEY STAFF: <br />Jimmy Richie, PE <br />Jerry Saval, PE <br />PEARL CITY HISTORIC AREA <br />INFRASTRUCTURE IMPROVEMENTS <br />Boca Raton, Florida <br />WGI was responsible for the design and permitting of infrastructure <br />improvements in the Pearl City and Lincoln Court neighborhoods. Pearl <br />City is a historic district within the City of Boca Raton. The project included <br />roadway, drainage, utility, street lighting and landscape improvements to <br />approximately two miles of residential and urban roadways. The scope <br />of services included public outreach with the affected neighborhoods <br />and adjustments to adjoining properties. Coordination and planning was provided <br />by a “Blue Ribbon Committee” appointed by the City Commission of Boca Raton <br />to ensure community involvement. <br />The project required permitting by SFWMD, Palm Beach County and the FDOT. <br />WGI prepared a Subsurface Water Management Report and conceptual and final <br />design documents. Prior to this project being constructed, the neighborhood had <br />no drainage infrastructure in place. <br />The project also required coordination with FPL, BellSouth and Adelphia Cable. <br />81