Laserfiche WebLink
REFERENCE: <br />City of Delray Beach <br />Isaac Kovner, PE <br />434 S. Swinton Avenue <br />Delray Beach, Florida 33444 <br />p. 561.243.7322 / f. 561.243.7060 <br />e. kovner@mydelraybeach.com <br />SERVICES PROVIDED: <br />Civil <br />DATE STARTED: <br />Design 2011 <br />DATE COMPLETED: <br />Design 2011 <br />TOTAL COST: <br />Design $46K <br />Construction $1.1M <br />PROJECT MANAGER: <br />Brian LaMotte, PE, LEED AP <br />KEY STAFF: <br />Erik Brueningsen, PE <br />Stephen Cherry, PE <br />Jason Alvarez, CST II <br />Delray Beach, Florida <br />SW 2ND STREET STREETSCAPE IMPROVEMENTS <br />WGI, through its continuing engineering contract with the City, provided <br />engineering design, surveying, permitting and bid phase services for a one- <br />mile section of a residential street. Services included landscaping and irrigation <br />design, drainage improvements, utility adjustments, roundabout design, traffic <br />calming, signage and sidewalk and driveway adjustments. WGI also provided <br />the boundary, topographic and location survey services required for the <br />design and subsurface utility engineering services for locating and designation <br />of underground utilities for design conflict avoidance. <br />Due to the very limited right-of-way and existing conditions, each roundabout had <br />to be designed separately to accommodate the adjacent improvements including <br />sidewalks, landscaping and driveways. <br />80