Laserfiche WebLink
12. NAME 13. ROLE IN THIS CONTRACT <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT FIRMa. TOTAL <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) <br />15. FIRM NAME AND LOCATION (City and State) <br />STANDARD FORM 330 (REV. 7/2021) PAGE 2 <br />a. <br />b. <br />c. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />e. <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Juan Pablo Romero, EI <br />CALTRAN Engineering Group, Inc. - 790 NW 107 Ave., Suite 200, Miami, Florida 33172 <br />BS in Civil Engineering, Florida International University 2010 <br />Mr. Romero has been involved in various planning projects, studies and data collection projects. He is experience in conducting various types of <br />traffic studies including traffic counts, vehicle classifications, turning movement studies, speed studies, travel time and delay studies, parking studies, <br />vehicle gap studies, and roadway characteristics inventory. He is responsible for the preparation of routes, schedules, maps, and field data collection. <br />Sun Life/Hard Rock Stadium MOT Plans <br />Since 2010, responsible for design engineering services for MOT plans per FDOT Standards for major detour along Florida's Turnpike connections <br />from Golden Glades and HEFT during pre- and post-special-event traffic. Includes key sheets, lane closure analysis, project layout, tabulation of <br />quantities using FDOT pay items, notes, special signing sheets, detour route plans for all Dolphin games and special events at stadium. <br />This project ensure a healthy traffic environment for the City of Sweetwater residents, visitors, and proposed public facilities and services typical <br />section businesses including committed developments assessment, provide a micro-simulation of existing and future conditions during AM and <br />PM peak periods, concurrency analysis, turn lane evaluation, and determine recommendations to mitigate possible impacts. <br />Served as prime consultant; included assignments such as qualitative assessments and traffic memorandums responding to public request that <br />included congestion and safety concerns. Provided video-data collection, crash analyses, evaluation of predominant crash types and potential <br />countermeasures for conceptual roadway and operational improvements. <br />Included multiple tasks assignments such as traffic operation roadway characteristics inventories, evaluation of speed limits, evaluation of general <br />public complaints, school zone reviews, and bottleneck studies. <br />Provided traffic engineering services as part of feasibility study to apply Complete Streets concepts. Provided existing conditions analysis, traffic <br />analysis for no build and build conditions, transit system operation analysis. Study recommended lane elimination and 1st bus preferential lane <br />only in Miami-Dade County. Responsible for design to apply a Complete Streets concept; included provided signing & pavement marking plans. <br />NW 17 Street Traffic Impact Analysis <br />FDOT D6, Districtwide Traffic Operations Consultant <br />FDOT D6, Districtwide Traffic Operations RCI Data Collection <br />Downtown Miami Streets (Lane Elimination) SW/SE 1st Street <br />Fundamental 101, 102 and 103 (Distance Learning) <br />TranStat. RCI Intermediate Field Data Collection. <br />Traffic Engineer 10 9 <br />✔ <br />✔ <br />✔ <br />✔ <br />✔ <br />2010-Present N/A <br />2016-2018 N/A <br />2018-Ongoing <br />N/A2017-2020 <br />N/A2017-2018 <br />N/A