My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALTRAN Engineering Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(21-11-01) Professional Planning and Zoning Consulting Services including Civil and Traffic Engineering CCNA FINAL.doc
>
RESPONSES
>
CALTRAN Engineering Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2021 11:03:56 AM
Creation date
12/6/2021 10:45:27 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Planning and Zoning Consulting Services
Bid No. (xx-xx-xx)
21-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br /> <br />26. NAMES OF KEY <br />PERSONNEL <br />(From Section E, Block 12) <br />27. ROLE IN THIS <br />CONTRACT <br />(From Section E, Block 13) <br />28. EXAMPLE PROJECTS LISTED IN SECTION F <br />(Fill in "Example Projects Key" section below before completing table. <br />Place "X" under project key number for participation in same or similar role.) <br />1 2 3 4 5 6 7 8 9 10 <br />Fabian De La Espriella Principal Planner X X X X <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />29. EXAMPLE PROJECTS KEY <br />N <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />STANDARD FORM 330 (REV. 7/2021) PAGE 4 <br />UMBER TITLE OF EXAMPLE PROJECT (From Section F) NUMBER TITLE OF EXAMPLE PROJECT (From Section F) <br />1 Atlantic Shores Boulevard Vision Plan and Preferred <br />Alternative Development 6 <br />2 Biscayne Green Tactical Urbanism Installation <br /> 7 <br />3 NPF CRA Mobility Master Plan <br /> 8 <br />4 SE/SW 1st Street Complete Streets Pilot Project <br />Planning & Implementation 9 <br />5 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.