Laserfiche WebLink
TITLE OF EXAMPLE PROJECT (From Section F) <br />G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />STANDARD FORM 330 (REV. 7/2021) PAGE 4 <br />26. NAMES OF KEY <br /> PERSONNEL <br />(From Section E, Block 12) <br />27. ROLE IN THIS <br /> CONTRACT <br />(From Section E, Block 13) <br />1 2 3 4 5 6 7 8 9 10 <br />29. EXAMPLE PROJECTS KEY <br />NUMBER TITLE OF EXAMPLE PROJECT (From Section F)NUMBER <br />28. EXAMPLE PROJECTS LISTED IN SECTION F <br />(Fill in "Example Projects Key" section below before completing table. <br />Place "X" under project key number for participation in same or similar role.) <br />JESUS MUSTAFA, P.E.SENIOR ENGINEER 2 <br />SENIOR ENGINEER 1 <br />SENIOR ENGINEER 2 <br />SENIOR DESIGNER <br />SENIOR SCIENTIST <br />CHIEF SCIENTIST <br />QUALITY CONTROL <br />RONALD SPENCER, P.E. <br />LOUIS REIS, P.E. <br />EDMUNDO ZEVALLOS <br />MILLIE RADZIKHOVSKY <br />STEPHEN TONJES <br />LUCY BECERRA <br />PD&E Widen SR-821/HEFT SR A1A Peter P. Cobb Memorial Bridge Rehabilitation <br />DW PD&E CONSULTANT SUPPORT SVCS. <br />SR-820/Pines Blvd/Hollywood Blvd. Planning & Design <br />GEC FDOT District 5 <br />Card Sound Road Feasibility Study <br />SR 916 Complete Streets / RRR <br />SR-5/US-1 Ponce de Leon Reconstruction