My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALTRAN Engineering Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(21-11-01) Professional Planning and Zoning Consulting Services including Civil and Traffic Engineering CCNA FINAL.doc
>
RESPONSES
>
CALTRAN Engineering Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2021 11:03:56 AM
Creation date
12/6/2021 10:45:27 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Planning and Zoning Consulting Services
Bid No. (xx-xx-xx)
21-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. NAME 13. ROLE IN THIS CONTRACT <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT FIRMa. TOTAL <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) <br />15. FIRM NAME AND LOCATION (City and State) <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />a. <br />b. <br />c. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />e. <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />LUCY BECERRA <br />BMA CONSULTING ENGINEERING, INC. (Pembroke Pines, Florida) <br />B.S. IN ECONOMICS <br />B.A. IN COMPUTER SCIENCE <br />DW PD&E and Support Services, FDOT District 4. <br />Developing and reviewing engineering and environmental documentation on transportation improvement projects and <br />Project Planning (Corridor Location), Preliminary Engineering (Feasibility Studies, Conceptual Design and PD&E), <br />Environmental Studies, implementation of ETDM, Sociocultural Effects Studies, traffic, and transit studies. TWOs orders <br />included SR 710/Beeline from SR 76 to Palm Beach Co Line PD&E Study; SR 714/West Martin Highway Concept Study. <br />This project includes roadway reconstruction, widening, and safety improvement of SR-5 from Ponce de Leon Boulevard <br />to SW 37th Avenue including the replacement of the pedestrian bridge over SR-5 and roadway milling and resurfacing <br />and intersection safety improvements at Riviera Drive as recommended in the respective Safety Study of each project <br />provided by FDOT. Role: Principal <br />The contract includes all necessary engineering, research, and coordination required for reviewing scoping reports, IJR/ <br />IMR documents, traffic reports, PD&E reports, and permit packages. Louis serves as Chief Engineer for the review of <br />PD&E Reports. Role: Specialist <br />Trail Projects assigned include: (1) Indian River Lagoon National Scenic Byway (IRLNSB) Signing Feasibility Study, (2) <br />IRLNSB-US 1 Signing Plan Update, (3) Scenic Sumter Heritage Byway (SSHB)-Rutland Park, Feasibility Study, (4) <br />Heritage Crossroads Scenic. Role: Senior Engineer. <br />Evaluating alternatives for the widening of the SR 821 (HEFT) from US 1 (MP 0) to Campbell Drive (coinciding with the <br />southern limits of the completed HEFT Widening PD&E Study from Campbell Drive (SW 312th Street) to US 1, FPID <br />423372-1). The project is approximately 3 miles. Role: QA/QC <br />SR 5/ US 1 from SW 37 Avenue to Ponce De Leon Blvd. and SR 5/ US 1 <br />at Riviera Drive FDOT District 6. <br />DW Plans Review and Support Services. FDOT, District 6. <br />General Engineering Consultant Services, FDOT, District 5, Florida <br />PD&E Widening HEFT (SR 821) from US 1 South of Palm Drive to <br />Campbell Drive in Miami-Dade County. <br />Principal/ Quality Assurance 25 8 <br />✔ <br />✔ <br />✔ <br />✔ <br />✔ <br />2020 <br />2018 2019 <br />2020 <br />2018 <br />2020
The URL can be used to link to this page
Your browser does not support the video tag.