Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />a. PROJECT OWNER <br />21. TITLE AND LOCATION (City and State) <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />a. <br />b. <br />c. <br />d. <br />e. <br />f. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />(3) ROLE <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />b. POINT OF CONTACT NAME <br />23. PROJECT OWNER'S INFORMATION <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)SR 916/ NW/NE 135th Street from NW 6th Avenue to West of US͈1/ SR͈5/ <br />Biscayne Boulevard. (Miami, Florida) <br />FDOT, District 6 <br />BMA CONSULTING ENGINEERING PRIMEMIRAMAR, FLORIDA <br />This two͈part project consist of <br />(1) Resurfacing, Rehabilitation, and Restoration of SR 916/NW/NE 135th Street from NW 6th Avenue to west of US͈1/SR͈5/ <br />Biscayne Blvd.: <br />• Mill and resurface existing roadway <br />• Cross-slope correction in media <br />• Install pavement markings after resurfacing <br />• Install new pavement markings (high emphasis pedestrian crosswalks at school zones, stop bars, standard yellow and <br />white line striping, arrows, and messages.) <br />• Install complete pedestrian signalization features at all signalized intersections (12 locations). <br />• Reconstruct all curb ramps up to current standards (16 locations). Add detectable warning surface, where missing (7 <br />intersections) <br />• Close un-used driveways (24 locations) <br />• Provide special drainage structure <br />• Permits requirements <br />• Provide new inlet and associated pipe system <br />• Changes to the mast arm located at the NW corner of 6 Avenue, maintain ADA access, provide new curb and verify <br />appropriate flow into the drainage system <br />(2) Safety Improvement to the intersections of SR 909/West Dixie Highway at SR 916 and SR 915/Memorial Hwy.: <br />• Provide an eastbound thru/left lead phase (potential new mast arm required). <br />• Prohibit right-turn on red for northeast bound and southeast bound approaches <br />• Install stop and right-turn only signs at driveways <br />• Provide “NEXT SIGNAL NE 135 Street” signs facing northeast bound and southwest bound traffic. <br /> <br />Size: 3 miles. <br />Construction cost: $6.2M <br />Humberto Gomez, P.E. <br /> 4 <br />(305) 640-7390 <br />2017 2021