My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2021-3272
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2021
>
Reso 2021-3272
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2022 3:21:09 PM
Creation date
12/23/2021 12:30:21 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2021-3272
Date (mm/dd/yyyy)
12/16/2021
Description
Purchase & Assignment of TDRs to Elias Saal & Diana Grimber.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
specific to the work to be performed in your unit must be delivered to the Condominium Management <br />office prior to the commencement of any work. <br />4. Only the modifications, alterations, and/or additions specifically set forth in the Plans have been approved. <br />You are not permitted to perform any other modifications, alterations, and/or additions to the unit without <br />the approval of the Hotel Unit Owner in accordance with Section 8 and 16.5 of the Declaration. Any such <br />additional modifications, alterations, and/or additions cannot be approved until and unless a properly <br />completed application together with plans detailing such work have been submitted to, and approved by <br />the Hotel Unit Owner. <br />Please be advised that the Hotel Unit Owner's review and approval of the Plans and any other submissions are <br />intended solely for the benefit of the Hotel Unit Owner. Neither the Hotel Unit Owner, nor any of its officers, <br />directors, agents or employees, shall be liable to you or any other person by reason of mistake in judgment, <br />failure to point out or correct deficiencies, negligence or any other misfeasance, malfeasance or non -feasance <br />arising out of or in connection with the approval of the Plans and other submissions. Without limiting the <br />generality of the foregoing, the Hotel Unit Owner is not responsible for reviewing, nor has it reviewed, the <br />Plans from the standpoint of safety, soundness, workmanship, materials, conformity with building systems, <br />usefulness, conformity with building or other codes or industry standards, or compliance with governmental <br />requirements. By making the approved modifications, alterations, and/or additions, you (and your successors <br />and assigns) agree to indemnify and hold harmless the Hotel Unit Owner from and against any and all claims, <br />damages, liabilities, cost and expenses whatsoever (including, without limitation, reasonable attorneys' fees and <br />court costs at all trail and appellate levels) arising out of or in connection with: (i) the Hotel Unit Owner's <br />review of the Plans and any other submissions, or (ii) your making of modifications, alterations, or additions to <br />the unit. <br />Please coordinate your work with the Condominium Management Office, by calling (305) 918-6906. The <br />office should be given advance notice of the intended commencement date for your work, the names of your <br />contractor, decorator and sub -contractors, as well as of the dates for delivery of materials and equipment to your <br />unit. <br />ANNEX <br />® Demo Plan `D-1': No objections on demolition. Based on the fact that they are removing walls, they <br />need to verify that no lines impacting the building are running on affected walls. <br />® Floor Plan A-1: Toilets in Master Bathroom to be relocated. As per plumbing plan they are planning to <br />tie toilets drain line using ejectors pumps. See my comment below. <br />o Reflected Ceiling Plan A-2: Additional new lighting fixtures and sprinklers heads relocation. See my <br />comments below. <br />a Flooring Plan A-3: They need to provide cut -sheet regarding the Sound Proofing Material to prove is <br />in full compliance with our recommendations. <br />© Details Schedules A-4: No comments <br />® Electrical Floor Plan E-1 and Schedules Details E -2: No continents <br />© Fire Protection FP -1 & FP — 2: They are proposing to relocate some Fire Sprinklers Heads, This has <br />to be done by our approved contractor, no independent contractor will be allowed to perform any <br />alteration to the system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.