My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2021-3272
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2021
>
Reso 2021-3272
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2022 3:21:09 PM
Creation date
12/23/2021 12:30:21 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2021-3272
Date (mm/dd/yyyy)
12/16/2021
Description
Purchase & Assignment of TDRs to Elias Saal & Diana Grimber.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F Mechanical Floor Plan M-1: The Toilet Exhaust Wall Corp has to be approved by our building <br />f M-2 <S& M-3: No comments <br />Plumbing Floor Plan P-1 & P-2: Additional information related to the Ejector Pumps with Tanks <br />`Liberty' Model Ascent II and the approach to tie in to existing drain lines is required. There are some <br />information on the Isometrics on P — 2 but I need to see details and specification of the proposed <br />system. They are proposing to relocate both toilets, his and her, and use the ejectors pump for the waste <br />water. This particular system has not been used in the system so I need to ensure has no potential for <br />leaks affecting units below. In addition, if they are planning to abandon the current sewer lines from <br />toilets and caps, I need to understand how are they reaching the lines under their slab without affecting <br />the unit below as well. Should be ideal if the GC has meeting with me to review all these observations <br />before I sign the documents and extend the letter. <br />General Notes and Details P — 3: All indicates that the new toilets are WC2 Flush Tank 1.28 GPF <br />Floor Mounted, Wall Discharged, please confirm. <br />t Windows on S-0: <br />> The Executive Director of Engineering has to approve plans/drawing for alteration to existing <br />fagade. <br />> The Executive Director of Engineering need further structural details, NOA for proposed <br />windows and wind load calculation to make sure the safety of the building is not compromised <br />while approved by the City of Sunny Isles. <br />Upon completion of the Modifications, Alterations, and/or Additions to the unit as described above, you <br />are required to obtain fi-om the building department a Certificate of Completion and you are required to <br />present this Certifi to to the Hotel Unit Owner as confirmation that the work was completed according <br />to the approval,gi-ant d by the Hotel Unit Owner. <br />EXECUTIVE DIRECTOR OF ENGINEERING <br />ACQUALINA MANAGEMENT LLC <br />D/b/a ACQUALINA OCEAN RESIDENCES & RESORT CONDOMINIUM ASSOCIATION, INC. <br />cc: Unit 4806 File <br />Approval letter for Modifications, Alterations & Additions Unit 4806 <br />
The URL can be used to link to this page
Your browser does not support the video tag.