Laserfiche WebLink
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />any agent of the City, to condemn any defective work or material shall not release the <br />Contractor from its obligations to install the Work free from faults and defects and to <br />promptly remove and repair any defective or deficient work. The Contractor hereby <br />acknowledges and agrees that no inspector shall have authority to: <br />(a) Authorize any deviation from the Contract Documents or approve any <br />substitute materials or equipment; <br />(b) Undertake any of the responsibilities of the Contractor, subcontractors or <br />Contractor's superintendent; <br />(c) Expedite the Work for the Contractor; <br />(d) Advise on or issue directions relative to any aspect of the means, methods, <br />techniques, sequences or procedures of construction unless such is specifically called <br />for in the Contract Documents; <br />(e) Advise on or issue directions as to safety precautions and programs in connection <br />with the Work- Provided however, this shall not preclude the City inspector from <br />notifying the Contractor of any hazardous or dangerous condition; <br />(0 Participate in specialized field or laboratory tests. <br />6.5 Coordination and Scheduling of Work <br />6.5.1 The Contractor shall cooperate with the City and any separate contractors <br />retained by the City, and the Contractor shall carefully coordinate and schedule the Work <br />as may be required to accommodate without delay or interference the Work of the City or <br />any of its separate contractors. <br />6.6 Contractor Responsible for Delays <br />6.6.1 The Contractor shall be responsible for any damages caused to the City as a <br />result of any delays caused by the Contractor. <br />6.7 Contractor Field Office and Storage. <br />6.7.1 The City agrees to provide Contractor with a field administration office and two (2) <br />exterior storage areas for Contractor's use in connection with the Work at no cost to the <br />Contractor. The Contractor, however, shall remain solely responsible for protection and <br />safekeeping of equipment and materials at or near the sites, and no claim shall be made against <br />the City by reasons of any act of an employee or trespasser. The Contractor will retain a frill set <br />of contract documents in the field administration office including this document and current as - <br />built plans available for the City's access at all times. <br />ARTICLE VII <br />THE CONTRACTOR <br />/� 13 <br />