My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2021-3279
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2021
>
Reso 2021-3279
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 12:49:51 PM
Creation date
1/19/2022 11:08:19 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2021-3279
Date (mm/dd/yyyy)
12/16/2021
Description
Ratifying Agmt w/Stout Group, Inc., Golden Shores Utility Undrgrnd
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />6.1.2 The City shall furnish to the Contractor, prior to execution of this Contract, <br />any and all written and tangible material in its possession concerning conditions below <br />ground at the site of the Project. Such written and tangible material is furnished to the <br />Contractor only in order to make complete disclosure of such material. <br />The City shall also furnish surveys, legal limitations and utility locations (if known), and a <br />legal description, if available, of the Project site. <br />6.1.3 The Contractor is responsible for compliance with, and shall secure at its <br />expense, all municipal review, construction, and inspection permits, provided, however, <br />all City of Sunny Isles Beach review, construction, and inspection fees will be waived save <br />and except fees for inspection. <br />6.1.4 The City shall furnish the Contractor, free of charge, two (2) copies of <br />the Contract Documents for execution of the Work. The Contractor will be charged, and shall <br />pay the City FIFTY Dollars ($50.00) per additional set of Contract Documents which <br />it may require. <br />6.2 City's Right to Stop Work <br />6.2.1 If the Contractor persistently fails or refuses to perform the Work in accordance <br />with this Contract, the City shall have the right, but not an obligation, to order the Contractor <br />to stop the Work, or any described portion thereof, until the cause for stoppage has been <br />corrected, no longer exists, or the City orders that Work be resumed. In such event, the <br />Contractor shall immediately obey such order. A stop work directive provided under this <br />paragraph shall not entitle the Contractor to an extension of the completion date nor any <br />financial compensation resulting from expenses due to delays caused by this Stop Work <br />directive provided said Stop Work directive is due to Contractor's actions or inaction. <br />6.3 City's Right to Perform Work <br />6.3.1 If the Contractor's Work is stopped by the City under Paragraph 6.2, or if <br />the Contractor persistently fails or refuses to perform the Work in accordance with this <br />Contract, and the Contractor fails within three (3) days of such stoppage, failure, or refusal, <br />to provide adequate assurance to the City that the cause of such stoppage will be eliminated <br />or corrected, then the City may, without prejudice to any other rights or remedies the City <br />may have against the Contractor, proceed to carry out the subject Work. In such a situation, <br />an appropriate Change Order shall be issued deducting from the Contract Price the cost <br />of correcting the subject deficiencies, plus compensation for the City's Representative's <br />additional services, if any, and expenses necessitated thereby, if any. If the unpaid portion of <br />the Contract Price is insufficient to cover the amount due the City, the Contractor shall pay <br />the difference to the City. <br />6.4 Inspections <br />6.4.1 No inspector shall have authority to waive any requirements of the Contract <br />Documents. Any failure or omission on the part of any inspector, the Engineer/Architect or <br />f <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.