My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3301
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2022 4:38:54 PM
Creation date
3/15/2022 10:46:57 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3301
Date (mm/dd/yyyy)
02/17/2022
Description
2nd Amend w/Craven Thompson for Add'l Svcs to GS Utility Undrgd.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Genesis Cuevas <br />CTA Proposal No. 2018-UO3.383 (Revised) <br />July 18, 2019 <br />Paee 4 <br />1.2 Project Definition <br />Based upon kickoff meeting with the CITY, CTA shall compile budgetary cost estimates <br />for the complete project. With input from the utilities, CTA will prepare a preliminary <br />schedule of the project to identify project milestones. CITY understands that at this <br />stage, the project is extremely conceptual with minimal input from FP&L or other <br />Utilities. Budget estimates are based upon general assumptions validated where <br />possible by FP&L and Utility providers. Estimates will identify general assumptions and <br />qualifications. <br />1.3 Meetings / Coordination with FP&L and Utilities <br />FPL - CTA to introduce project to FP&L and identify project as defined by CITY. Through <br />meetings and correspondence, CTA will determine project details, including existing and <br />proposed utility locations, service connections, easements, service requirements, <br />timelines, phasing, limitations, tariff, responsibilities (FP&L, CITY, and CTA), preliminary <br />costs, and other information needed to move the project forward as well as <br />coordination with other utilities. <br />Other Utilities — In conjunction with FP&L, CTA shall solicit other utilities to introduce <br />the project and identify details including existing and proposed utility locations, service <br />connections, easements, service requirements, timelines, phasing, limitations, permit <br />procedures, preliminary costs, pole/line agreements, relocation, design criteria and <br />other information needed to move the project forward and coordination with other <br />utilities. Other utilities include phone, cable, water, gas, sanitary and storm sewers. <br />City — In providing the above services, CTA shall attend periodic meetings with CITY to <br />provide review and update of findings. The frequency of meetings will be as <br />determined by CITY and predicated by progress and issues that arise. Services for this <br />task to be billed on an hourly basis with a Not -to -Exceed cost. Additional fees will only <br />be paid with prior authorization and approval from the CITY. For the purpose of this <br />proposal, CTA estimate of effort assumes an average of 4 hours per week over a period <br />of ten (10) weeks to be spent on meetings and coordination with CITY. <br />1.4 Existing Conditions Plan <br />In addition to soliciting information from utilities identified within the project limits, <br />CTA shall research existing atlases, right-of-way maps, survey, plat, and as-builts to <br />assess completeness. Once compiled, information will be analyzed to determine if <br />sufficient to create a base file for design within the corridor. The purpose of this task is <br />to gather information necessary to create an electronic base -file depicting existing <br />conditions to be used for design. The intent of this task is to locate existing features <br />with a reasonable degree of accuracy so that proposed improvements can be designed <br />CRAVEN IROMPSON & ASSOCIATES INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.