My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3301
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2022 4:38:54 PM
Creation date
3/15/2022 10:46:57 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3301
Date (mm/dd/yyyy)
02/17/2022
Description
2nd Amend w/Craven Thompson for Add'l Svcs to GS Utility Undrgd.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Genesis Cuevas <br />CTA Proposal No. 2018-UO3.383 (Revised) <br />July 18, 2019 <br />Page 3 <br />The survey will meet all the current surveying requirements of the Board of Professional <br />Surveyors and Mappers of the State of Florida, as defined in Chapter 51-17, Florida <br />Administrative Code and will includethe following: <br />■ The location of all aboveground visible improvements, including pavement, slabs, <br />fences, signs, mailboxes, streetlights, overhead poles/wires and utility features, <br />within the limits of this survey, as defined above. <br />• Trees within the right-of-way, 3 inches in diameter or larger at breast height will be <br />located and identified with their common name, if known. <br />■ Rims, inverts, and pipe sizes and material will be measured on any drainage and <br />sanitary structures found along the route, if accessible and physically unobstructed. <br />Otherwise, they will be noted on the drawing. <br />■ Cross-section elevations will be taken at 50 -foot intervals along all roadways, and <br />cover from right-of-way to right-of-way including swales. <br />• A survey baseline will be established along each roadway with survey control points <br />set at 200 -foot intervals with x -y -z coordinate values on them. <br />■ All elevations will be relative to North American Vertical Datum of 1988 (NAVD88) <br />and based on National Geodetic Survey (NGS), Florida Department of <br />Transportation (FDOT), or South Florida Water Management benchmarks. <br />■ Benchmarks will be provided on survey control, set on, or immediately adjacent to <br />the project, and shown on the survey for future construction. <br />■ The preparation of the survey drawing will be in AutoCAD Civil 3D, version 2017 or <br />higher, drawing file format, and provided along with a hard copy, signed and <br />sealed, <br />Approximate time of completion: three four (3-4) months, after receipt of Notice to <br />Proceed (weather permitting). <br />1.1.b. Topographic Survey of FPL Equipment Areas 15 sites (20'-30') (CTA Task No. 12160) <br />The survey will meet all the current surveying requirements of the Board of Professional <br />Surveyors and Mappers of the State of Florida, as defined in Chapter 5J-17, Florida <br />Administrative Code and will include the following: <br />■ The surveys will include the location of all aboveground visible improvements, <br />including pavement, slabs, fences, signs, mailboxes, overhead wires and utility <br />features, within the limits of each site, as defined above. <br />■ Trees within the site, 3 inches in diameter onlarger at breast height will be located <br />and identified with their common name, if known. <br />■ All elevations will be relative to North American Vertical Datum of 1988 (NAVD88) <br />and based on National Geodetic Survey (NGS), Florida Department of <br />Transportation (FDOT), or South Florida Water Management benchmarks. <br />Approximate time of completion: five - six (5-6) weeks, after Task I.I.a is completed <br />(weather permitting). <br />CRAVEN 1NOMPSON & ASSOCIMES INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.