My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3301
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2022 4:38:54 PM
Creation date
3/15/2022 10:46:57 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3301
Date (mm/dd/yyyy)
02/17/2022
Description
2nd Amend w/Craven Thompson for Add'l Svcs to GS Utility Undrgd.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Genesis Cuevas <br />CTA Proposal No. 2018-UO3.383 (Revised) <br />July 18, 2019 <br />Page 6 <br />equipment to the extent possible. In addition, CTA shall identify proposed easements <br />required to accommodate additional above -grade improvements. CTA assumes most <br />underground features to be located within the right-of-way with the occasional <br />exception for larger equipment and service connections. <br />2.3 Prepare Design Development Plans <br />Based upon input on Preliminary plans from FP&L and utility providers, CTA shall <br />incorporate individual design improvements into the Underground Plan. Once updated <br />CTA will redistribute to all utilities for confirmation and further coordination. <br />2.4 Prepare Easement Descriptions <br />Most of the proposed equipment is assumed to be placed within the public right-of- <br />way. However, there will be occasion for some equipment to be placed on private <br />and/or public property therefore requiring an easement dedication. Based upon <br />information coordinated with the' utility requesting the easement, CTA shall provide <br />specific purpose survey and sketch and legal description of the easement. Pursuit of <br />easement dedication and/or processing/recording of the easement is by the City. <br />Although the exact number of easements cannot be determined without plans, based <br />upon preliminary information from FPL, it is anticipated that fifteen (15) easements will <br />be required. Preparation of individual sketches with legal descriptions of each FPL <br />Equipment Site that are ready for recording purposes in the Public records of Miami <br />Dade County. <br />Approximate time of completion: two -three (2-3) weeks after Task 1.1.b is completed. <br />2.5 Site Lighting Plan <br />With removal of the overhead lines, existing power -poles and attached lighting will be <br />removed. It is the City's intent to replace the existing lighting with decorative poles <br />more evenly distributed throughout the neighborhood. With assistance from Hillers <br />Electrical Engineering (HEE), a lighting plan shall be prepared. Plan will be based upon <br />fixture and criteria established by City. Service to lighting will be established with FPL <br />and coordinated through the undergrounding plans. <br />2.6 Prepare Construction Documents <br />Based upon input from Design Development plans from FP&L and utility providers, CTA <br />shall refine the Underground Plan into Construction Documents (CD's). Plans shall <br />incorporate sufficient detail for construction of proposed improvements and be used as <br />basis for bids and permits. With permit approvals, plans will progress to 100% CD's. <br />CRRIEN. IROMPSON & ASSOCIMES INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.