|
51
<br />SECTION E Qualification Information and Assigned Personnel
<br />RFQ # 21-11-01 PROFESSIONAL PLANNING AND ZONING CONSULTING SERVICES, CIVIL AND TRAFFIC ENGIEERING
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />Complete one Section E for each key person.)
<br />12. NAME
<br />Jacqueline Bonfill
<br />13. ROLE IN THIS CONTRACT
<br />Principal in Charge
<br />14. YEARS EXPERIENCE
<br />a. TOTAL 31 b. WITH CURRENT FIRM 28
<br />15. FIRM NAME AND LOCATION (City and State)
<br />J.Bonfill & Associates, Inc., Miami, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Bachelor of Architecture – University of Miami, Miami, FL
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Florida – Registered Architect - AR0013685
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />National Council of Architectural Registration Boards - NCARB 42,659
<br />19. RELEVANT PROJECTS
<br />a.
<br />1) TITLE AND LOCATION (City and State)
<br />Miami-Dade College Homestead Campus Parking Lots: 55, 56, 57 and 466
<br />English Avenue Parking Lot, Homestead, FL
<br />2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />10-2016
<br />CONSTRUCTION (If applicable)
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Homestead Campus Parking Lots 55, 56, 57: Boundary and Topographic Survey of approximately 7.71 acres and complete R/W
<br />Survey. Complete R/W on all streets abutting the property with elevations every 50 feet along the Right of Way. All visible above
<br />ground utilities including water lines on R/W including location and size (verify with Homestead Water and Sewer Department records).
<br />466 English Avenue Parking Lot: Grid elevation every 50 feet. Boundary and Topographic Survey of Campus, Parking areas
<br />approximately 8 Acres. Location of all existing ground features. Tree Survey. Verification of all improvements. Above ground visible
<br />utilities, manholes, curves, signs etc., rim and elevations. Elevation information per NGVD 1929 Datum. Total area surveyed
<br />approximately 15.71 Acres COST: $20,240 ROLE: Principal in Charge
<br />b.
<br />1) TITLE AND LOCATION (City and State)
<br />Miami-Dade College Wolfson Campus: 300 NE 2nd Avenue Miami, FL
<br />4 parcels: Classrooms / Student Union Building, Miami, FL
<br />2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />05-2010
<br />CONSTRUCTION (If applicable)
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Boundary & topographic survey in State Plane coordinates. Located all visible above-ground improvements, easements, elevations @
<br />50' grid, Metro Mover columns & edge of overhead structure. Topographic route survey in State Plane coordinates. Set centerline
<br />controls & survey tie to Section Corner, Set W to E & S to N baselines. Set elevation control along the route (TBM). Roadway cross-
<br />sections @ 50’ stations. Underground utility location by GPR & Radio Electro-Magnetic Frequency; flagging of water, sewer, electric &
<br />communication lines. Located all visible above ground utilities, type of utilities & corresponding companies. Designated the horizontal
<br />locations of all drainage & underground utilities, including type, alignment, size, material & whether active or inactive. Elevations for all
<br />underground structures. COST: $14,052 ROLE: Principal in Charge
<br />c.
<br />1) TITLE AND LOCATION (City and State)
<br />Coconut Grove Business District Street Improvement Project, Grand Av
<br />between Mary St & Mc Donald St; Mc Farland between Grand Av & South
<br />Bay Shore Dr; Main Hwy between Franklin Av & Grand Av, Miami, FL
<br />2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />10-2011
<br />CONSTRUCTION (If applicable)
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Topographic R/W Survey & underground utility location for replacement of brick paver sidewalks & tree plantings. Including: Design
<br />Level Survey (DTM file), elevations @ 25' along edge of pavement, crown of road, curb, sidewalk. Location of all above ground visible
<br />utilities, driveways, poles, mailboxes, R/W striping & traffic sigs, loop detectors, trees within the R/W. Control points, survey base line.
<br />Approximately 4,740 LF of R/W Survey. COST: $21,534 ROLE: Principal in Charge
<br />d.
<br />1) TITLE AND LOCATION (City and State)
<br />Homestead General Airport Miami-Dade Strategic Airport Master
<br />Planning - 28700 SW 217 Avenue Homestead, FL 33030 - 25°29'92"N
<br />80°33'25"W, Homestead, FL
<br />2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />06-2009
<br />CONSTRUCTION (If applicable)
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Established GPS ground control points and provided location and elevation information for Aerial Photogrammetry for the LPV
<br />approaches at Homestead General Aviation Airport X51, approximately 977 acres. Provided location & elevation data for obstructions
<br />within the runway 18-36 approach surfaces at X-51; Field verification;114 aerial targets. COST: $ 22,000 ROLE: Principal in Charge
<br />e.
<br />1) TITLE AND LOCATION (City and State)
<br />North Shore Park & Youth Center, 7200 Collins Avenue,
<br />Miami Beach, FL
<br />2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />02-2012
<br />CONSTRUCTION (If applicable)
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Boundary & Topographic Survey for DEP Permit 12-207. Elevations of: structures, landscape & concrete areas; Flood elevation
<br />certificates. Setbacks for buildings & improvements tied to existing coastal construction line; Tree location; Light Poles, Sidewalks,
<br />Signs, Fences, Driveways. Inlets, Catch Basins, Manholes, located up to the centerline of R/W; coastal construction line; erosion
<br />control line; platted easements. 02-2012 update of coastal construction line & topographic information for compliance with DEP; reflect
<br />the coastal construction line; topographic information to extend to the center line of Collins Av; tree survey update; GPR Underground
<br />Utility Location COST: $25,318 ROLE: Principal in Charge
|