Laserfiche WebLink
52 <br />SECTION E Qualification Information and Assigned Personnel <br />RFQ # 21-11-01 PROFESSIONAL PLANNING AND ZONING CONSULTING SERVICES, CIVIL AND TRAFFIC ENGIEERING <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Complete one Section E for each key person.) <br />12. NAME <br />Joaquin Araya <br />13. ROLE IN THIS CONTRACT <br />Senior Party Chief <br />14. YEARS EXPERIENCE <br />a. TOTAL 15 b. WITH CURRENT FIRM 11 <br />15. FIRM NAME AND LOCATION (City and State) <br />J.Bonfill & Associates, Inc., Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Mechanical Engineering Power Systems Installations and Design – <br />Naval Academy, Cuba <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />19. RELEVANT PROJECTS <br />a. <br />1) TITLE AND LOCATION (City and State) <br />Miami-Dade College Wolfson Campus: 300 NE 2nd Avenue, <br />4 parcels: Classrooms / Student Union Building, Miami, FL <br />2) YEAR COMPLETED: <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION (If applicable) <br />N/A <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Boundary & topographic survey in state plane coordinates. Located all improvements, easements, elevations @ 50' grid. Topographic <br />route survey. Set centerline controls & survey tie to section corner, set W to E & S to N baselines. Set elevation control along the route <br />TBM). Roadway cross-sections @ 50’. Underground utility location by GPR & EM; flagging of utility lines. Located all visible above <br />ground utilities, type of utilities & corresponding companies. Designated horizontal locations of drainage & underground utilities, <br />including type, alignment, size, material. Elevations for underground structures. COST: $14,052 ROLE: Party Chief <br />b. <br />1) TITLE AND LOCATION (City and State) <br />Miami-Dade College 4000 New Parking Garage, 950 NW 20th Street <br />Miami, FL <br />2) YEAR COMPLETED: <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />2020 <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Services include: Topographic Survey for Tentative Plat; Boundary to be tied to State Plane Coordinates; Inverts, material, size and <br />directions for structures as manholes and catch basins; Final Plat; One Lot/Track Subdivision to exclude all Right of Ways dedications; <br />Submittal to City of Miami and Miami Dade County for Tentative and Final Plat; Five (5) Sketch & Legal and GPR. COST: $21,060 <br />ROLE: Party Chief <br />c. <br />1) TITLE AND LOCATION (City and State) <br />Coconut Grove Business District Street Improvement Project, Grand Av <br />between Mary St & Mc Donald St; Mc Farland between Grand Av & South <br />Bay Shore Dr; Main Hwy between Franklin Av & Grand Av, Miami FL <br />2) YEAR COMPLETED: 10-2011 <br />PROFESSIONAL SERVICES <br />2011 <br />CONSTRUCTION (If applicable) <br />N/A <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Topographic R/W Survey & underground utility location for replacement of brick paver sidewalks & tree plantings. Including: Design <br />Level Survey (DTM file), elevations @ 25' along edge of pavement, crown of road, curb, sidewalk. Location of all above ground visible <br />utilities, driveways, poles, mailboxes, R/W striping & traffic sigs, loop detectors, trees within the R/W. Control points, survey base line. <br />Approximately 4,740 LF of R/W Survey. COST: $21,534 ROLE: Party Chief <br />d. <br />1) TITLE AND LOCATION (City and State) <br />Mary Brickell Village Drainage Improvements Project: SW 9th St from SW <br />1st Av to SE 1st Av; SW 10th St from SW 1st Av to SE 1st Av, SW 11th St <br />from SW 1st Av to SE 1st Av; SW 12th St from SW 1st Av to SE 1st Av, <br />Miami, FL <br />2) YEAR COMPLETED: <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION (If applicable) <br />N/A <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Topographic R/W Survey and underground utility location for the design of road improvements. 6,035 LF of R/W Survey. Cross- <br />sections @ 50’ / @25’ at critical areas. Baseline and City of Miami Monument Lines. Tree location. Location of driveways, poles, <br />mailboxes, all above ground visible utilities, Inverts & rim elevations for sanitary & storm sewer. Topographic survey of SW 9th, 10th, <br />11th & 12th Streets. S. Miami Ave Survey from R/W line to R/W line, with cross section @ 50'. Finish Floor Elevations of houses <br />adjacent to R/W. Ground Penetrating Radar (GPR) Underground utility location including: 15 test holes w/report of findings. GPR utility <br />location & Radio Frequency location. Vacuum excavation test holes for verification. COST: $37,350 ROLE: Party Chief <br />e. <br />1) TITLE AND LOCATION (City and State) <br />Florida international University BT 887 Green School of International & <br />Public Affairs (SIPA) Building, Modesto Maidique Campus, Miami, FL <br />2)YEAR COMPLETED: 05-2010 <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />2019 <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Partial list of Services included: Specific Topographic Survey area as per request on aerial photo received 6/11/19; Locate existing <br />trees and vegetation indicating common names, canopy, trunk & height. If trees are not identifiable by our surveying crew, owner is <br />responsible for consulting with a botanist or a tree expert for species identification; Topographic information and information relating to <br />all above ground features including vaults, manholes, drainage inlets, pedestals, pumps, light poles, etc.; Topographic Grid 25’x25’ (or <br />as close to this grid size) as possible within the project limits; please identify any breakpoints in addition to the grid. (Provide topo to the <br />break point, meaning if grades slope up or down please define that the slope break at the high point for drainage purposes); Existing <br />Lake outfall (Coord with as-built information for said outfall) Provided by client; Bathymetric survey for adjacent lake/pond/water <br />feature; all curb cuts, walkways, drives FEE $10,755 ROLE: Party Chief