|
52
<br />SECTION E Qualification Information and Assigned Personnel
<br />RFQ # 21-11-01 PROFESSIONAL PLANNING AND ZONING CONSULTING SERVICES, CIVIL AND TRAFFIC ENGIEERING
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />Complete one Section E for each key person.)
<br />12. NAME
<br />Joaquin Araya
<br />13. ROLE IN THIS CONTRACT
<br />Senior Party Chief
<br />14. YEARS EXPERIENCE
<br />a. TOTAL 15 b. WITH CURRENT FIRM 11
<br />15. FIRM NAME AND LOCATION (City and State)
<br />J.Bonfill & Associates, Inc., Miami, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Mechanical Engineering Power Systems Installations and Design –
<br />Naval Academy, Cuba
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />19. RELEVANT PROJECTS
<br />a.
<br />1) TITLE AND LOCATION (City and State)
<br />Miami-Dade College Wolfson Campus: 300 NE 2nd Avenue,
<br />4 parcels: Classrooms / Student Union Building, Miami, FL
<br />2) YEAR COMPLETED:
<br />PROFESSIONAL SERVICES
<br />2010
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Boundary & topographic survey in state plane coordinates. Located all improvements, easements, elevations @ 50' grid. Topographic
<br />route survey. Set centerline controls & survey tie to section corner, set W to E & S to N baselines. Set elevation control along the route
<br />TBM). Roadway cross-sections @ 50’. Underground utility location by GPR & EM; flagging of utility lines. Located all visible above
<br />ground utilities, type of utilities & corresponding companies. Designated horizontal locations of drainage & underground utilities,
<br />including type, alignment, size, material. Elevations for underground structures. COST: $14,052 ROLE: Party Chief
<br />b.
<br />1) TITLE AND LOCATION (City and State)
<br />Miami-Dade College 4000 New Parking Garage, 950 NW 20th Street
<br />Miami, FL
<br />2) YEAR COMPLETED:
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If applicable)
<br />2020
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Services include: Topographic Survey for Tentative Plat; Boundary to be tied to State Plane Coordinates; Inverts, material, size and
<br />directions for structures as manholes and catch basins; Final Plat; One Lot/Track Subdivision to exclude all Right of Ways dedications;
<br />Submittal to City of Miami and Miami Dade County for Tentative and Final Plat; Five (5) Sketch & Legal and GPR. COST: $21,060
<br />ROLE: Party Chief
<br />c.
<br />1) TITLE AND LOCATION (City and State)
<br />Coconut Grove Business District Street Improvement Project, Grand Av
<br />between Mary St & Mc Donald St; Mc Farland between Grand Av & South
<br />Bay Shore Dr; Main Hwy between Franklin Av & Grand Av, Miami FL
<br />2) YEAR COMPLETED: 10-2011
<br />PROFESSIONAL SERVICES
<br />2011
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Topographic R/W Survey & underground utility location for replacement of brick paver sidewalks & tree plantings. Including: Design
<br />Level Survey (DTM file), elevations @ 25' along edge of pavement, crown of road, curb, sidewalk. Location of all above ground visible
<br />utilities, driveways, poles, mailboxes, R/W striping & traffic sigs, loop detectors, trees within the R/W. Control points, survey base line.
<br />Approximately 4,740 LF of R/W Survey. COST: $21,534 ROLE: Party Chief
<br />d.
<br />1) TITLE AND LOCATION (City and State)
<br />Mary Brickell Village Drainage Improvements Project: SW 9th St from SW
<br />1st Av to SE 1st Av; SW 10th St from SW 1st Av to SE 1st Av, SW 11th St
<br />from SW 1st Av to SE 1st Av; SW 12th St from SW 1st Av to SE 1st Av,
<br />Miami, FL
<br />2) YEAR COMPLETED:
<br />PROFESSIONAL SERVICES
<br />2010
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Topographic R/W Survey and underground utility location for the design of road improvements. 6,035 LF of R/W Survey. Cross-
<br />sections @ 50’ / @25’ at critical areas. Baseline and City of Miami Monument Lines. Tree location. Location of driveways, poles,
<br />mailboxes, all above ground visible utilities, Inverts & rim elevations for sanitary & storm sewer. Topographic survey of SW 9th, 10th,
<br />11th & 12th Streets. S. Miami Ave Survey from R/W line to R/W line, with cross section @ 50'. Finish Floor Elevations of houses
<br />adjacent to R/W. Ground Penetrating Radar (GPR) Underground utility location including: 15 test holes w/report of findings. GPR utility
<br />location & Radio Frequency location. Vacuum excavation test holes for verification. COST: $37,350 ROLE: Party Chief
<br />e.
<br />1) TITLE AND LOCATION (City and State)
<br />Florida international University BT 887 Green School of International &
<br />Public Affairs (SIPA) Building, Modesto Maidique Campus, Miami, FL
<br />2)YEAR COMPLETED: 05-2010
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable)
<br />2019
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Partial list of Services included: Specific Topographic Survey area as per request on aerial photo received 6/11/19; Locate existing
<br />trees and vegetation indicating common names, canopy, trunk & height. If trees are not identifiable by our surveying crew, owner is
<br />responsible for consulting with a botanist or a tree expert for species identification; Topographic information and information relating to
<br />all above ground features including vaults, manholes, drainage inlets, pedestals, pumps, light poles, etc.; Topographic Grid 25’x25’ (or
<br />as close to this grid size) as possible within the project limits; please identify any breakpoints in addition to the grid. (Provide topo to the
<br />break point, meaning if grades slope up or down please define that the slope break at the high point for drainage purposes); Existing
<br />Lake outfall (Coord with as-built information for said outfall) Provided by client; Bathymetric survey for adjacent lake/pond/water
<br />feature; all curb cuts, walkways, drives FEE $10,755 ROLE: Party Chief
|