Laserfiche WebLink
f. Trucks/Trailers (for reinforcing steel deliveries) <br />g. Generators <br />4. Temporary shoring and excavation: <br />a. <br />Cranes (crawler and hydraulic) <br />b. <br />Drill rigs <br />c. <br />Pile -driving equipment <br />d. <br />Concrete trucks <br />e. <br />Trucks/Trailers <br />f. <br />Backhoes/Excavators <br />g. <br />Loaders/Dozers <br />h. <br />Dump Trucks <br />i. <br />Compaction equipment <br />j. <br />Dewatering pumps (diesel and electric) <br />k. <br />Generators <br />5. Mat foundation preparation and concrete pour: <br />a. Cranes (tower, crawler, and hydraulic) <br />b. Backhoes/Loaders <br />c. Pumps (both for dewatering and concrete) <br />d. Trucks (dump trucks, concrete trucks, equipment trucks, etc.) <br />e. Trailers <br />f. Concrete finishing equipment <br />6. Tower Crane and Man/Material Hoist Erection, Jumps, and Dismantling: <br />a. Large crawler and hydraulic cranes (for tower crane and man/material hoist <br />assembly and erection) <br />b. Tower cranes (for tower crane and man/material hoist jumping) <br />c. Large crawler and hydraulic cranes (for tower crane and man/material hoist <br />dismantling) <br />d. Generators <br />e. Tractor trailers <br />Other concrete placement activities: <br />a. Cranes (tower, crawler, and hydraulic) <br />b. Concrete pumps <br />c. Concrete trucks <br />d. Truck/trailers <br />e. Generators <br />Additional Information (as applicable to project) <br />Truck Route: Describe truck routes (attach route map), include number of trucks and <br />staging location. <br />94 <br />