My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zoning Resolution 22-Z-189
SIBFL
>
City Clerk
>
Resolutions
>
Zoning
>
2022
>
Zoning Resolution 22-Z-189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2022 9:29:57 AM
Creation date
3/29/2022 12:39:09 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Zoning Resolution
Resolution Number
22-Z-189
Date (mm/dd/yyyy)
02/17/2022
Description
Approving site plan modification App PZ2021-22, by La Playa Beach Assoc., LLC formerly known as "Varadero" located 18801 Collins Ave.
Supplemental fields
Comment
Per Claudia 3/29/22, docs have to be executed and recorded once project comes from Build permit, cc: Finance, C/M, and Building Dept.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The number of trucks will vary greatly over the course of the project. During concrete <br />operations, we expect a minimum of fifty (50) deliveries in the course of a typical day. <br />The proposed truck route for the project will be as shown on the attached Traffic Pattern <br />to Enter/Exit Jobsite. Most trucks, except for the foundation mat concrete trucks, will be <br />staged on-site and not on Collins Avenue. The contractor will design project trucks routes <br />within the property to allow for truck staging within the site. <br />In addition, the contractor will have trained and certified flagmen ("gate attendants") at <br />each gate that will ensure no trucks stage on Collins Avenue and will allow trucks to exit <br />the site with minimizing disruption to traffic. <br />As at Jade Signature, our contractor will hold training sessions with all subcontractors and <br />vendors to review the truck route and rules and regulations regarding truck deliveries. For <br />example, at Jade Signature, the contractor has inserted language into all subcontracts <br />and purchase orders requiring them to: <br />1. Fully comply with plans like this one, at all times <br />2. No delivery vehicles are allowed to make "u -turns" on Collins Avenue <br />3. No delivery vehicles are allowed to utilize side streets or commercial parking lots <br />to make "turn-arounds" <br />4. No delivery vehicles are allowed to block Collins Avenue for any reason <br />Material Storage Location: Describe the location for material storage (if needed). Any <br />removal or relocation of sand, must be approved separately. <br />It is our intention that some materials will be stored on-site, space permitting. Locations <br />will vary throughout the course of the activities; however, the materials will remain inside <br />the fenced construction site. <br />Construction Trailer: Will a construction trailer be used? If so, show location? <br />Construction trailers (for both managers and materials/equipment) will be required on- <br />site. Please see the proposed locations on-site, below: <br />95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.