We will require our contractor to prevent trucks and other equipment from blocking <br />traffic without the required MOT plan enactment. <br />Parking: Indicate the number of workers and the areas where their vehicles will be parked <br />through the duration of this phase of the project. <br />The number of workers will vary during the course of the project, but at the peak, we <br />expect approximately 225 individual workers. As the number of available parking spots <br />and vacant lots continues to decrease in and around Sunny Isles Beach, we will ensure <br />that workers carpool as much as possible. Further, we will secure parking at the <br />Haulover Beach parking lots and bus the workers from the parking location to the <br />construction site, then back to their vehicles at the end of their shift. <br />Clean-up: Describe the measures that will be taken to ensure that the work site and public <br />right-of-way will be maintained (including dust control, swale on driveways to prevent <br />water leaks to the street, gutter buddies, rocks at driveways, etc.) <br />Similar to Jade Signature, we will require the contractor to keep the construction site <br />safe and clean, including the immediate area outside the construction site to provide an <br />environment safe for walking pedestrians and personal vehicles. <br />Specific measures that will be taken to ensure a clean jobsite are: <br />1. Truck tire -wash areas at all project site exits prior to leaving the project. At Jade <br />Signature, the contractor developed steel grating to allow all tire surfaces to be <br />cleaned with the mud/dirt falling into the gaps in the grating, preventing this <br />mud/dirt from flowing into the street (see photo, below). The tires will be cleaned <br />using pressure washers to ensure full removal of mud/dirt/concrete. <br />H <br />97 <br />