My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zoning Resolution 22-Z-189
SIBFL
>
City Clerk
>
Resolutions
>
Zoning
>
2022
>
Zoning Resolution 22-Z-189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2022 9:29:57 AM
Creation date
3/29/2022 12:39:09 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Zoning Resolution
Resolution Number
22-Z-189
Date (mm/dd/yyyy)
02/17/2022
Description
Approving site plan modification App PZ2021-22, by La Playa Beach Assoc., LLC formerly known as "Varadero" located 18801 Collins Ave.
Supplemental fields
Comment
Per Claudia 3/29/22, docs have to be executed and recorded once project comes from Build permit, cc: Finance, C/M, and Building Dept.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Like at Jade Signature, rather than have gravel or stone entrances and exits <br />to/from the construction site, we will have the contractor provide and maintain a <br />reinforced concrete apron, which is much easier to clean and maintain as <br />opposed to gravel/stone. On the jobsite side of the concrete aprons, the <br />contractor will install the wash -down grating described above. <br />3. Curb inlets in Collins Avenue along the length of the site will receive erosion <br />control measures in accordance with the soon to be prepared, submitted, and <br />approved erosion control plan. There are various types of these curb gutter inlet <br />sediment prevention devices and our contractor will coordinate with the City and <br />FDOT. Additionally, the sediment that gets collected on the outside of the <br />sediment prevention device will be cleaned daily to prevent clogging, water <br />ponding, and sediment build up. <br />4. The full-time gate attendants will receive specific training on cleaning and <br />maintenance. They will wash down, sweep, and remove any dirt, sediment, and <br />debris, whether deposited from the jobsite or not. These full-time gate attendants <br />will also keep all sidewalks clear, clean, and safe at all times and, like at Jade <br />Signature, will be trained to deal with non -construction related pedestrian and <br />vehicular traffic. <br />5. The contractor will set up numerous water sources on-site for project individuals <br />to spray down the site to minimize wind-blown dirt/sand from leaving the project. <br />During site preparation and grading, a water truck will be used to wet the site. <br />Fencing: Construction fencing must be constructed of durable material, and additional <br />silt fencing for additional protection. Gates should be steady and properly secure during <br />non -working hours. <br />We take great pride in the "face" of our construction sites (the fencing) and require our <br />contractors to install temporary construction fencing that is constructed in a permanent <br />manner and in accordance with the City of Sunny Isles Beach requirements. The <br />fencing will be constructed of thick, durable plywood that will either be painted or <br />receive fastener -attached metal panel signage (similar to Jade Signature). The plywood <br />will be securely mounted to an engineered structural support system made of either <br />solid wood posts and stringers or hollow structural steel ("HSS") shapes embedded into <br />holes and encased in concrete. The back side of the fence will be lined with silt fence to <br />prevent sediment run-off from the jobsite, under the fence, onto the sidewalk or other <br />adjacent areas. <br />All gates will be sliding gates, rather than swinging gates, to ensure that the gates do <br />not accidentally swing into the right-of-way due to the strong winds in Sunny Isles <br />Beach. The gates will be constructed of the same materials as the fencing in order to <br />match the fence and provide a consistent look for the project. All gates will be secured <br />with high-strength pad locks when closed at the end of each day. During the day, we <br />will have full-time attendants at all open gates to prevent unauthorized access and <br />ensure the safety of the public. This may also include providing a "warning barrier" in <br />1I <br />98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.